DVB MPBR-HP Скачать руководство пользователя страница 2

INSTALLATION 

MANUAL

NEED HELP?

855-680-9595

STEP 1  |  

To install pem nuts, place 

the provided M5 hardware through the top 

of the bridge and thread the pem nut by 

hand.

STEP 2  |  

Use a 3mm allen head to 

tighten the bolt while holding the pem 

nut until it “catches” in the bridge and is 

secure.  

 

Take caution not to over tighten or the 

bolt head may strip.

Begin by unpacking all items and 

inspecting for missing pieces or damage. 

If you have any concens, please contact the 

company the product was purhcased from. 

-(8) M5x16 Allen Head
-(8) M5x12 Allen Head
-(2) M5 Pem Nuts

HARDWARE 

INCLUDED

Отзывы: