DV8 TCGL-02 Скачать руководство пользователя страница 3

 

 

4.

 

Move the lower bottom bracket in place. In the side of the JT, you have two holes, a threaded and 
non-threaded. Using the supplied hardware, loosely thread lower bottom bracket into side of bed.  

5.

 

Next, install the two slide brackets into the rail. You will need to use the large access hole in the 
front to fit the mounts into the rail. Ensure you use supplied hardware as shown in the image. These 
will be tightened later to keep slide mounts into place.  

 

 

Содержание TCGL-02

Страница 1: ...TCGL 02 Jeep Gladiator JT In Bed Stand Up Tire Carrier ...

Страница 2: ...e are any concerns NOTE This requires the use of the Jeep Trail Rail Management System 2 Depending on the side of the vehicle you intend to mount the TCGL 02 reference images below for the layout of the lower floor bracket 3 Bolt the two above brackets together using supplied M10 hardware Leave all hardware loose until the end Passenger Driver ...

Страница 3: ...pplied hardware loosely thread lower bottom bracket into side of bed 5 Next install the two slide brackets into the rail You will need to use the large access hole in the front to fit the mounts into the rail Ensure you use supplied hardware as shown in the image These will be tightened later to keep slide mounts into place ...

Страница 4: ... hardware mount the main carrier to the lower bottom bracket Keep carrier loose at this point 7 Once carrier is loosely attached to the lower bottom bracket attached the rail bracket to the carrier and the two slide brackets ...

Страница 5: ...et Drill hole and secure with bolt and nut Drilled stability hole recommended for 35 or larger tires 9 To mount tire insert threaded post into carrier from the exterior facing to the interior Place tire onto post and place cone facing wheel followed by round plate and T handle As you are tightening the T handle place your foot on the wheel and press tire into bed as you tighten the carrier ...

Отзывы: