![Durr Dental XR 04 Скачать руководство пользователя страница 12](http://html.mh-extra.com/html/durr-dental/xr-04/xr-04_installation-and-operating-instructions-manual_2542881012.webp)
12
10
F
W
E
11
12
Pos. 1
Pos. 2
9.6 Assembling of the XR 04
• Replace heater (4) and film transporter (3),
see pict. 5.
• Replace daylight attachment (13).
• Put the perforated collector (6) in the water
container (6), see pict. 11 and right fold-in
page.
10. OPERATION
• Machine switch (2)
ON.
Developer-/Fixer bath are being warmed up.
• Processor regulating timer (1)
ON.
Set processing time, see pict. 12.
without heater:
Regulator on pos.
1
3 1/2 mins
with heater:
Regulator on pos.
2
2 1/2 mins.
• Place the wrapped exposed film in the
daylight attachment.
• Insert hands into rubber cuffs and unwrap
film.
• Enter film into the transporter system.
• Remove processed film from the water bath.
Washing: A min. of 5 mins in the perforated
collector (6) (max. 1 hour)
• Processor regulating timer (1)
OFF
.
13
4
6
Содержание XR 04
Страница 1: ...INSTALLATION AND OPERATING INSTRUCTIONS X RAY FILM PROCESSOR DÜRR XR 04 ...
Страница 2: ...2 ...