53
Date
Generator Hours
Maintenance Performed
Maintenance Log
As a best practice it’s recommended to keep a log of the generator hours and maintenance to
ensure your generator is always operating to its full potential.
Break-In Period
As the best practice for any new combustion motor it’s recommended to perform the break
in procedure as follows:
●
Run the generator for the first 6-8 hours on conventional oil, then change the oil. After
the break-in period synthetic oil may be used.
●
During the break in period of the first 6-8 hours keep the generator load under 50%
for optimal results.
●
Check and clean the air filter if necessary after the break-in period.
Содержание DUROMAX DUAL FUEL XP8500EH
Страница 2: ......
Страница 5: ......
Страница 14: ...14 ...
Страница 20: ...20 20 ...
Страница 28: ...28 ...
Страница 37: ...37 ...
Страница 40: ...40 ...
Страница 44: ...44 ...
Страница 69: ...69 TROUBLESHOOTING This section of the manual is to help you troubleshoot problems with your generator ...
Страница 75: ...75 Replace generator cover Replace the back cover of the generator and secure it with the 2 bolts 8 ...
Страница 76: ...76 WIRING DIAGRAM ...
Страница 77: ...77 ...
Страница 83: ......
Страница 84: ...5800 Ontario Mills Parkway Ontario CA 91764 United States 844 DUROMAX REV XP8500EH 07272022 ...