12
DM4P10K
July 2018
18. Install Lock Rods & Linkage components per the drawing Fig.8. Also, install the Crossbeam
Bracket (#96) to middle / outside of each Crossbeam and secure with the provided Hardware
shown in Fig.6.
Note: Crossbeam Linkage Rods may be pre-installed to Crossbeams.
Also, ensure pre-installed T-Bar ‘linkage’ Rod is properly routed through guide ring
weldments located on the underside of the Mainside Runway.
Fig. 8
19. Mount the Power Unit (#8) to the Mainside Column with the attached mounting bracket using the
Hardware provided, shown in Fig.9. Once mounted, fill the Power Unit reservoir tank with
hydraulic fluid. Now, install the 90 degree Hydraulic Fitting (#44) to the high pressure port on the
Power Unit.
Fig. 9
T-Bar Rod
(Under Mainside Runway)
Long Rod (#80)
Short Rod (#83)
(See Exploded View
Details on Page 23)
Содержание DM4P10K
Страница 1: ...July 2018 DM4P10K Four Post Lift 10 000 lbs Capacity 5 000 lbs per axle INSTALLATION OWNERS MANUAL ...
Страница 4: ...4 DM4P10K July 2018 FLOOR PLAN LAYOUT DM4P10K Shown with optional Drip Trays Jack Tray ...
Страница 21: ...21 DM4P10K July 2018 EXPLODED VIEW 1 Optional Accessories Shown ...
Страница 22: ...22 DM4P10K July 2018 EXPLODED VIEW 2 ...
Страница 23: ...23 DM4P10K July 2018 EXPLODED VIEW 3 ...