DuraVent DPC2 Скачать руководство пользователя страница 6

6

Step 1: Locate the chimney in a convenient place as 

near as possible to the appliance outlet. 

Step 2: Cut and frame the openings in the ceiling and 

roof where the chimney will pass. 

NOTE: 

It is important to follow the framing dimensions 

for the floor openings prescribed in this manual.

FRAMING DIMENSION

CHIMNEY

SIZE

CEILING SUPPORT

 ROOF

OPENING

6"

14-3/8’’ x 14-3/8’’

14’’ x 14’’

7"

14-3/8’’ x 14-3/8’’

15’’ x 15’’

Step 3: From below push the support into the framed 

opening. Attach the support to the framed box 

using (12) - 3” spiral nails or #8 x 1 1/2” wood 

screws 

(see Figure 5).

Step 4: Put this first chimney length in the support. 
 

Turn in clockwise to lock it in place. 

NOTE:

    Make  sure  arrow  on  pipe  label  is  pointing 

upward. 

Step 5: In the Attic, install an Attic Insulation Shield 

and Collar from above. 

(see Figure 6).

Step 6: Stack the next chimney length on the first 

length. Be sure that the male and female 

threads are not in line when putting the lengths 

together. Turn the chimney clockwise to lock it 

in place. You may add a 1/2” stainless steel self 

tapping screw to prevent accidental unlocking.  

Continue until the required chimney height is 

reached. 

Step 7: 

ROOF FLASHING INSTALLATION 

 

Put the roof flashing in place. Seal the joint 

Table 3

SILICONE

CAULKING

INTERIOR STRAIGHT INSTALLATION

2

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

between the roof and the flashing with 

roofing compound. For sloping roofs, place 

the flashing under the upper shingles and on 

top of the lower shingles. Nail the flashing 

to the roof. Place the storm collar around 

the chimney and slide down on top of the 

flashing. Tighten it with the bolt supplied and 

make sure the joint is properly caulked 

(see 

Figure 4).

Step 8: Attach the rain cap to the top of the chimney.  

(See Figure 3). 

Figure 4

CEILING SUPPORT (SFC)

NAILS OR SCREWS

Figure 5

1. BLACK STOVE PIPE

2. FINISHING SUPPORT

3. INSULATED LENGTH

4. ATTIC INSULATION 

SHIELD

5. ADJUSTABLE ROOF 

FLASHING

6. RAIN CAP

Figure 6

Содержание DPC2

Страница 1: ...C S629 M87 CONTENTS WARNING 2 KEEP YOUR CHIMNEY CLEAN SIZING CHART 3 GENERAL INSTALLATION NOTES 4 5 INTERIOR STRAIGHT INSTALLATION 6 EXTERIOR INSTALLATION 7 9 REPLACEMENT PARTS 10 11 WARRANTY 13 WARNI...

Страница 2: ...e Do not fill these spaces with any material whatsoever especially not insulating material Inspection Contact local building or fire officials about restric tions installation inspections and permits...

Страница 3: ...tic wood or stainless steel hes Do not use a brush that will scratch the nless steel interior of your chimney not expect chemical chimney cleaners to keep your mney clean Their use does not negate the...

Страница 4: ...spaces shall be enclosed in all cases to avoid personal contact with the chimney and damage to the chimney Except for installation in single and two story family dwellings the enclo sure must have a f...

Страница 5: ...LL BE LESS THEN 2 Figure 2 GENERAL INSTALLATION NOTES CONT D 1 NOTE DIAGRAMS ILLUSTRATIONS ARE NOT TO SCALE 7 5 MIN RAIN CAP COLLAR To remove cap unscrew the collar screw to untighten the collar Pull...

Страница 6: ...that the male and female threads are not in line when putting the lengths together Turn the chimney clockwise to lock it in place You may add a 1 2 stainless steel self tappingscrewtopreventaccidenta...

Страница 7: ...quired cleaning 7 The minimum distance between the bottom of the Tee and any horizontal combustible including the ground is 2 Figure 7 NOTE DIAGRAMS ILLUSTRATIONS ARE NOT TO SCALE Wall Support HOLE SI...

Страница 8: ...pping it with the aluminum tape supplied with the tee Step4 FastenachimneylengthtothetopoftheTee Step 5 The Wall Support should be installed on the first vertical chimney section above the Tee Tighten...

Страница 9: ...the flashing with roofing compound For sloping roofs place the flashing under the upper shingles and on top of the lower singles Nail the flashing to the roof using roofing nails Placethestormcollara...

Страница 10: ...H TEE CAP TWIST LOCK DPC2 TCI INSULATED TEE CAP TWIST LOCK SUPPORTS DPC2 CA FLUE EXTENSION DPC2 SFC CEILING SUPPORT W COUPLER DPC2 URES WALL SUPPORT BRACES FIRESTOPS DPC2 AARS ADJUSTABLE INSULATED ATT...

Страница 11: ...2 VC RAIN CAP DPC2 DVL ASHT DECORATIVE COLLAR SINGLE WALL STOVE PIPE INSTALLATION KITS DPC2 WSK WALL SUPPORT KIT INCLUDES 1 OF EACH DPC2 TCI DPC2 WTI DPC2 T DPC2 CA DPC2 DVL DPC2 AWBU DPC2 URES DPC2 V...

Страница 12: ...12...

Страница 13: ...rials must not be burned in the appliance or fireplace In case of a chimney fire the chimney must be inspected and approved by a certified Chimney Sweep before reuse After each annual inspection maint...

Страница 14: ...g repair parts always give the following information 1 The model number of the vent system 2 The part number 3 The description of the part 4 The quantity required 5 The installation date of the chimne...

Отзывы: