Step 4:

  Slide the latch on to the handle shaft. Enter shed, 

close door and adjust latch so it is snug with the stud 
at the side of the door. Tighten up bolt on latch. 

Note: Repeat Step 4 for second door handle if double security doors.

 

FORTRESS SECURITY DOOR (Optional) 

Step 1:

  Place shed in final position. Check diagonal meas-

urements are equal and shed is level before fitting 
door. 

Step  2:   

Hold Door in 

position  (approximately 
5mm  down  from  Top 
Plate  Flashing)  and  fit 
one  rivet  to  top  hinge. 
While  still  holding  in 
position  fit  one  rivet  to 
bottom hinge. 

Step 3: 

Close door and check it fits correctly. If 

not, drill out rivets and make necessary adjust-
ments. Fit remaining rivets to all three hinges. 

Содержание TUF 50

Страница 1: ...Quality Made Affordable ASSEMBLY INSTRUCTIONS TUF 50 BASE SIZE 1140mm x 1355mm...

Страница 2: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools w...

Страница 3: ...lashing Hardware Pack 2 1 1 890 1 160 1 1 175 Red 45 x 45 H1 Red 70 x 45 H1 Red 45 x 45 H1 Yellow 45 x 45 H1 FLASHINGS Door Jambs Top Plate Flashing PACKED BY DATE BASE SIZE 1 140 x 1 355 TOP PLATES T...

Страница 4: ...ns to Red See fig 2 for nailing detail on Top Front Plate 70x45mm Step 3 Position remaining End Frame on top of plates While someone sup ports frame nail in place using two 75mm nails per join Step 4...

Страница 5: ...oor Jambs Position left hand Door Jamb Flashing at correct measurement from left cladding detail and nail to Top Plate using a 30mm clout Do not fit 50mm nails at this stage Pre drill holes to make na...

Страница 6: ...clout top and bottom Step 5 Drill a hole through Door Jamb Flashings and Wall Sheets top and bottom Nail with 50mm nails fig 1 Nail left hand Door Jamb Flashing to Stud using three 30mm Clouts at equ...

Страница 7: ...nd back Fit one more rivet evenly spaced in centre of each join Step 3 Line up ribs on the roof with ribs on the walls While someone holds the Front Plate straight nail the roof to Top Plate using one...

Страница 8: ...ate Flashing and fit one rivet to top hinge While still holding in position fit one rivet to bottom hinge Step 3 Close door and check it fits correctly If not drill out rivets and make necessary adjus...

Страница 9: ...RITY DOOR Optional Step 1 Place shed in final position Check diagonal meas urements are equal and shed is level before fitting door Step 2 Hold Door in position approximately 5mm down from Top Plate F...

Страница 10: ...Floor Joist For sheds being placed on a purpose built floor we recommend that the studs are shortened by 30mm The Wall Sheets will then protrude 20mm below the Base Plate This will stop water flowing...

Страница 11: ...in most environments The surface must be dry and free of dirt oil grease and other contaminants prior to painting but no weathering of the surface is required Zinc rich primers are recommended for use...

Страница 12: ...nd very severe environmental situations or in any area where the mild steel corrosion rate as published by BRANZ exceeds 200g m2 3 Minimum maintenance must be carried out in accordance with instructio...

Отзывы: