background image

DURATUF PREMIUM SHED WARRANTY

 

GUARANTEE TO CUSTOMER

 

Congratulations on purchasing a Duratuf Storage Shed. With proper care and attention, this product will last many years.

 

For your benefit 

PLEASE READ THE FOLLOWING INFORMATION CAREFULLY.

 

 
 

WARRANTY ON METAL CLADDING

 

Riverlea Group Ltd guarantee that the metal roofing and wall cladding on Kiwi and Fortress Garden Sheds may be used in moderate and 
inland corrosion zones or areas where the first year mild steel corrosion rate is less than 200g/m2, and that in these conditions, they will 
not perforate due to corrosion within 30 years of date of manufacture.

 

 
 

TERMS AND CONDITIONS

 

1.

 

Damage or corrosion due to the following circumstances is not covered by this warranty.

 

 

Mechanical, chemical or other damage sustained during or after installation.

 

 

 

   

NOTE: 

Clean swarf off shed 

IMMEDIATELY

 after assembly

 

 

 

   Do 

NOT 

mark cladding with pencil

 

 

 

   Do 

NOT 

allow manures, chemicals or other corrosive materials to have direct contact with cladding

 

 

 

   Chemical damage will result if these instructions are not carried out

 

 

Force majeure or other causes beyond the control of Riverlea Group Ltd.

 

 

2.

 

This warranty does not cover material installed in severe and very severe environmental situations, or in any area where the mild 
steel corrosion rate (as published by BRANZ) exceeds 200g/m2.

 

3.

 

Minimum maintenance must be carried out in accordance with instructions below.

 

 

Should the cladding fail to perform as specified above, the liability of Riverlea Group Ltd shall in all cases be limited to replacing or      
repairing the defective product. The balance of the original warranty will cover any repaired or replaced material. Riverlea Group Ltd will 
not be liable for any consequential loss or damage, labour or transport charges. All claims made in writing within 21 days of discovery, 
quoting the reference number at the top right hand corner of this page.

 

 

 

 

MAINTENANCE

 

 

Following are the minimum maintenance requirements for cladding used in Kiwi Garden Sheds and Fortress Sheds. 

 

 

Washing all surfaces by rain, and annual hosing of sheltered areas using a hose and soft nylon brush.

 

 

Within 2km of coast—wash every 3 months as above. After a storm, wash the cladding and the gutters as soon as possible 
to remove any highly corrosive salt deposits.

 

 

Volcanic Ash Fallout—wash as soon as possible, removing fallout from roof and gutters

 

 

Gutters to be kept clean of leaves and dirt.

 

Please visit http://www.riverleagroup.co.nz/warranty

-

garden

-

sheds to validate the Warranty on your shed.

 

Click on the Warranty Registration Link and complete all details.

 

If you are unable to access the computer, please phone us on 0800 438 274 and one of the customer services team will help you to acti-
vate the warranty on your garden shed.

 

 

Many thanks, from the Team at Riverlea Group.

 

WARRANTY REGISTRATION

 

Содержание MK4C

Страница 1: ...Quality Built In ASSEMBLY INSTRUCTIONS MK4C BASE SIZE 4210mm x 4210mm ...

Страница 2: ... checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools with care Use a Safety Trip Switch It is easier and quicker if this shed is erected by two people Your shed must be level Achieve this by either levelling the ground or by using blocks If you shed is t...

Страница 3: ...Paint Brush Roof Sheets 0 580m 0 603 x 0 603m 0 588 x 0 150m 1 Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Window Hardware Pack 4 560m 2 255m 2 255m 0 350m 0 900m 1 Roof Sheets Flat Roof Sheet Clear Roof Panel Pressed Capping Sheet Bevel Edge Support 45 x 45mm Clear Roof Hardware Pack Security Double Door Hardware Pack Alarm MA20 Shed light Bolt Down Kit Peg Down Kit KIWI MK4C P...

Страница 4: ......

Страница 5: ...185m Nogs Nail studs to each end of Plates Nail in re maining two Studs using 1 185m Nogs to get correct posi tion Position Nogs centrally between Plates and nail in place Step 3 End Wall Select one 4 210m Base Plate Green one 4 210m Top Plate Red four Studs Yellow and three Nogs Lay out Plates and one Stud on a flat surface and nail Stud centrally between Plates Nail remaining Studs to Plates usi...

Страница 6: ...ck Stud and skew nail in place using two 75mm nails each end Pre drilling holes before nailing will prevent timber from splitting Step 6 Place intermediate Roof Beams by using Roofing Nogs to determine correct position see fig 2 Nail intermediate Roof Beams in place Nail 70x45mm Roofing Nogs in place End Wall Step 7 Place Frame in correct position checking the shed is square and level Dynabolt Fra...

Страница 7: ...Tack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be re positioned the nails can easily be prized out If a window is required identify Wall Sheet s with window hole pre cut Lean up Wall Sheets where window s are to be located Note When fitting Gable End Sheets en sure they overlap correctly fig 1 The overlap direc tion ma...

Страница 8: ...Plate use a String Line At the top of the gable nail two 30mm Clouts into the end of each Ridge Beam This will stop it from twisting Step 3 End Walls Lean Gable Wall Sheets against the shed to form gable shape With the LIP flush with side of Stud tack in place ensuring the bottom of the Wall Sheet is 10mm above the bottom of the Bottom Plate Tack on re maining Wall Sheets Repeat with other gable e...

Страница 9: ...rill holes in each corner and nail Window Frame to framing using 50mm nails Step 4 If the Window is in the gable end tempo rarily position the Over Panel above Win dow Frame Following the same angle as the gable mark and cut to suit Step 5 Rivet Over Panel to the Window Frame with rivets 588mm Step 1 Lay out the two window studs 883mm and Nog 634mm on a flat surface Position Nog and nail in place ...

Страница 10: ...rstep Flashing in between Door Jambs at bottom of doorway nail through top of flashing using five 30mm Clouts Re peat with the Overdoor Flashing A105 Step 1 Lay out the two window studs 883mm and Nog 590mm on a flat surface Position Nog and nail in place using two 75mm nails at each end 570mm Step 6 From the outside of the shed place glass in Window Frame Attach a Glazing Bead G100 with three rive...

Страница 11: ...e 50mm Clout nail through Rib into Back Top Plate Repeat at the front Note The 10 x 50mm Clouts on end ribs are covered by the Barge Flashings Step 1 Position first Roof Sheet centrally over Ridge Beam on the right hand end of shed with the LIP on the left hand side For sheds with a Clear Roof Panel go to the next page Position the next Roof Sheet Ensure it overlaps correctly then rivet together o...

Страница 12: ...nsure sheet joins are flush at the outside edge then rivet flat sheets to pressed sheets Two rivets per join Centralise Roof at the other end and screw in place Step 4 Ensure Ridge Beam is straight then nail the Clear Panel and Flat Roof Sheet or second Clear Panel to 45x45mm Bevelled Edge Supports using one 30mm Clout per Pan Run two generous beads of Silicone on the under side of the Pressed Cap...

Страница 13: ...ashing Position Centre Door Stop on the front face of the Overdoor Flashing and up against the underside of roof Pre drill holes and nail in place with 50mm nails Step 5 Clean out ALL drill filings Also make sure the Wheels are cleaned of drill filings Re hang Doors then insert door stops into the pre drilled holes at end of tracks as shown in diagram Tighten with two spanners Door Track Bolt Wash...

Страница 14: ...er Barge Flashing Check Spoutings are straight then rivet to Roof one rivet every second Rib Step 3 On the back of the left hand door position latch so that the hook on the door handle will be secure and go in and out easily Rivet in place with four rivets Left Hand Door Right Hand Door Hook Latch Step 1 Attach T locking handle with two 8x10mm screws TO R H door Door without the weather strip Slid...

Страница 15: ... Plate This will stop water flowing in between the Base Plate and Floor The Floor should be made 15mm smaller than Base Size Note Although it is not essential fitting Damp Proof Course in between the Base Plate and the Floor will give added protection against moisture CLEAN UP Remove all swarf drill filings with a soft brush or rag Hose down roof and walls thoroughly For Coloursteel sheds use touc...

Страница 16: ...ceeds 200g m2 3 Minimum maintenance must be carried out in accordance with instructions below Should the cladding fail to perform as specified above the liability of Riverlea Group Ltd shall in all cases be limited to replacing or repairing the defective product The balance of the original warranty will cover any repaired or replaced material Riverlea Group Ltd will not be liable for any consequen...

Страница 17: ......

Страница 18: ......

Отзывы: