ASSEMBLE AND INSTALL SECTIONS
STEP A3: INSERT TOP RAIL
Insert the bottom routed top rail holes into the pickets
securely
(Fig. A3).
Fig.A1
STEP A1: INSTALL BOTTOM RAIL STEEL INSERT
First, insert the Steel Reinforcement Channel
to the
bottom rail, top routed holes on top
before installing the
pickets
(Fig. A1).
STEP A4: INSTALLING ASSEMBLE PANEL INTO THE POST
Slide both top and bottom rails of the assembled panel into the Post A
then to the opposite Post B
(Fig. A4)
. Level and plumb both post and
assemble panel.
Property of Duramax Building Products © December 2021
STEP A2: ASSEMBLE THE PANEL USING THE
PICKETS AND BOTTOM RAIL
Starting on one end, insert the Pool pickets into top routed
bottom rail holes continue inserting the remaining pickets
across the panel (
Fig. A2).
Fig.A2
Fig.A3
Fig.A4
POST A
POST B