Option 1 (soft ground)
Slide one ground anchor (part 12) into bottom of each
post until it meets bottom cross rail. Using two 1” self-
tapping screws per post, screw the post to ground
anchor using the pilot holes for guides.
Using ground anchor installation layout drawing, dig
holes approximately 10” deep. Set trellis in holes and
level. Back fill with soil removed from holes.
Option 2 (permanent installation)
NOTE: There is very little room for error with this
installation method.
Using ground anchor installation layout drawing, dig
holes 10” deep according to dimensions. Fill with
cement and place ground anchors in wet cement. Be
sure that ground anchors are straight and in accordance
with dimension of ground anchor installation layout
drawing. Allow cement to dry.
Slide trellis over ground anchors. Using two 1” self-
tapping screws, fasten post to ground anchor.
Ground Anchor Installation
Ground Anchor Layout Drawing
27.75
"
Wellington Trellis - Page 4
Содержание Wellington 11173
Страница 2: ...75 28 Wellington Trellis Page 2...