background image

8. Secure the Right and Left Corner 

panels and (when installed) the Door 

Panel.  Use Anchor Angles supplied in 

Hardware Package.  Position the Angle 

fl

 ush to the inside of panel frame.  

Hold wall panel snug against post while 

installing Anchor Angle.

  See Drawing

.

9. Attach Angle to Panel with 

two (2) #8 x 1/2” self-drilling 

screws.  Drill 3/16” hole into 

deck and install #10 x 1” Hex Head Screw.

10. Attach Door Panel Angle on 

solid section of Panel.  

See Drawing.

After all Front Wall Panels are installed, lower the Roof to its 

fi

 nal position.

11. Install top bolt and wing nut through Trim Covers and Post.

Installing Side Walls Panels

1. For proper side walls installation, the front 

and back corners of each side wall must be plumb.  

Starting at the back of the awning next to the 

RV, drop a plumb line from the end of the Valance 

Track to the deck and mark that point on deck.

See Drawing.

To mark the front corner point, measure out 1-1/4” 

from the 

fl

 ange of the Post Bottom Anchor. 

Snap your chalk line between the two points on 

the deck.  This line marks the location of the 

outside edge of the Side Wall Panel.

2. Before installing the RV Wall Channel to the RV, 

attach the provided 1” x 1” Foam Tape to the side

of channel that will attach to the RV. 

3. Install Wall Channel by aligning it to the inside of 

chalk line on deck and plumb line on side of the RV.  

Wall Channel runs from deck to bottom lip of 

Mounting Rail.  Attach to RV with three #10 x 1-1/2” 

screws into wall of RV.

Page 3

Black Flashing

under Angle.

Содержание Dura-Breeze

Страница 1: ...ome Check the material received Match your shipment with the Bill of Materials If there is a shortage or wrong material call Dealer Service immediately Safety is important Wear Safety Glasses and Work...

Страница 2: ...used Tools Hammer Level Tape Measure Hack Saw Chalk Line Plumb Line Skill Saw with Flat Head Carbide Blade Screw Driver Clamp Drill with 5 16 1 4 Drill Bits 1 4 5 16 nut drivers Fasteners Description...

Страница 3: ...n center See Post Spacing Drawing below If your front wall is 10 14 18 22 26 etc you will have a 24 Half Panel at a front corner Posts for this panel must be 20 3 16 on center The Corner Post is offse...

Страница 4: ...d panel with the foam tape resting on top of panel Helpful Hint The right end of the panel should extend 1 1 4 past the right end of the flange of the Post Bottom Anchor 4 Refer to Wall Layout Diagram...

Страница 5: ...nstallation the front and back corners of each side wall must be plumb Starting at the back of the awning next to the RV drop a plumb line from the end of the Valance Track to the deck and mark that p...

Страница 6: ...m the Deck to top of Wall Panel not the Gable Wall Joiner for proper Spacer Panel height Cut Spacer Panel to fit these measurements 7 Remove second Screen Panel 8 Cut a section of U Channel to fit bot...

Страница 7: ...p Bracket and fasten in position just marked Fasten with 8 x 1 2 screw through center of Post Top Bracket Slide Post back up into position and install screw and wing nut Be sure wing nut is on inside...

Страница 8: ...der using 8 x 1 2 self drilling screws 3 Cut Threshold to 35 1 2 Notch for outswinging door as shown in drawing Install with 1 4 plastic lag shields and 12 x 1 1 2 screws unless installing on wood dec...

Отзывы: