background image

Ph: 519-923-9813 | E: [email protected]| Web: www.dundalkleisurecraft.com

2. Floor Assembly

Screw (SV-03) Front Back Floor Supports to (SV-04) 
Floor Joists using the provided 2 ½” (64mm) screws.

SV-04

SV-03

3. Once the base is assembled as in 

(Fig.3), use  1 ½” (38mm) screws to 

fasten the (SV-02)Shower Floor Boards to 

each of (SV-04) Floor Joists spacing floor 

boards evenly.

(Fig.3)

SV-02

Savannah Standing Shower– CTC205

Parts Identification & Assembly Instructions

1. To start the assembly of your 

Savannah shower, unpack the 

contents of the crate with the help 

of a friend. All parts are located 

inside of the back wall assembly 

as in (Fig. 1)

(Fig. 1)

Отзывы: