Ph: 519-923-9813 | E: [email protected]| Web: www.dundalkleisurecraft.com
2. Floor Assembly
Screw (SV-03) Front Back Floor Supports to (SV-04)
Floor Joists using the provided 2 ½” (64mm) screws.
SV-04
SV-03
3. Once the base is assembled as in
(Fig.3), use 1 ½” (38mm) screws to
fasten the (SV-02)Shower Floor Boards to
each of (SV-04) Floor Joists spacing floor
boards evenly.
(Fig.3)
SV-02
Savannah Standing Shower– CTC205
Parts Identification & Assembly Instructions
1. To start the assembly of your
Savannah shower, unpack the
contents of the crate with the help
of a friend. All parts are located
inside of the back wall assembly
as in (Fig. 1)
(Fig. 1)