www.factorybuysdirect.com
200337-01A
12
Side View
Front View
INSTALLATION
Installing Wall Spacers
1. Place heater on wall mounting bracket.
2. Mark screw locations on wall.
3. Remove heater from mounting bracket.
4. If installing bottom mounting screws into hol-
low or solid wall, install wall anchors. Follow
steps 1 through 4 under
Attaching To Wall
Anchor Method,
page 11. If installing bottom
mounting screw into wall stud, drill holes at
marked locations using 9/64" drill bit.
5. Replace heater onto mounting bracket.
6. Place spacers between bottom mounting
holes and wall anchor or drilled hole.
7.
Hold spacer in place with one hand. With other
hand, insert mounting screw though bottom
mounting hole and spacer. Place tip of screw
in opening of wall anchor or drilled hole.
8. Tighten both screws until heater is firmly
secured to wall. Do not over tighten.
Note: Do not replace front panel at this time.
Replace front panel after making gas connec-
tions and checking for leaks.
Figure 10 - Installing Bottom Mounting
Screws
Figure 11 - Removing Screen
Figure 12 - Installing Log
Wall
Spacer
Screw Securing
Screen
Heater
INSTALLING LOG
1. Remove 2 screws securing screen to
the front panel. Lift screen up and out to
remove from heater. See Figure 11.
2. Remove packaging material from log.
3. Slide slots on the ends of the log onto log
brackets while inserting pins in the back
of the log into slots in the back panel.
Screen
Slot for
Installing Log
Slots in
Back Panel
for Log Pins
Log
Bracket
(Shown with
optional blower)