Section 200 Maintenance

200.1   Safe Shut Down Procedure

CAUTION: To avoid possible equipment damage or personal injury, assume that there is AC voltage present 

inside the LG inverter system unit any time AC input power or DC battery voltage is applied. The inverter is 

capable of providing output voltage from the batteries even when there is no AC input line voltage. When AC 

input voltage is present, the unit can provide output voltage even when the batteries are disconnected.

Do not touch components inside the unit. DC voltage is always present at the batteries and battery cables.

Final Shut Down Procedure

1)  Open the unit’s front access panel.

2)  Place the LG Battery Switch S2 in the off OFF position and then place the AC Input circuit breaker at the service panel 

in the OFF position. 

CAUTION: HAZARDOUS ENERGY IS STORED IN CAPACITORS INSIDE THE LG UNIT. AFTER TURNING OFF 

SWITCHES, ALLOW 5 MINUTES FOR CAPACITORS TO DISCHARGE BEFORE ATTEMPTING ANY SERVICE 

PROCEDURES.

3)  If the service technician does not need to access the inside of the unit, keep the unit’s front cover/door closed.

4)  If the unit will be shut off for an extended period of time, recharge batteries every 60 to 90 days.  

CAUTION: The batteries will be damaged and the warranty voided if not routinely recharged.

NOTE: To turn power back on, follow the “System Start-up Procedure” outlined in Section 108. Be sure to complete all 

of the steps to assure the unit will operate properly.

200.2 Routine System Maintenance

The 

LG

 inverter system unit is designed to provide years of trouble-free operation. The unit does require some routine 

attention to assure peak performance. The Manufacturer recommends a Preventative Maintenance check be performed 

by a qualified service technician at least every six months. The technician must observe important safety precautions 

while performing the following recommended tasks:

• 

Inspect and clean the unit interiors;

• 

Inspect all batteries for leaks, case swelling or terminal corrosion;;

• 

Perform an emergency operation test to check operation of all critical connected loads

200.3 Manual Routine Inverter Tests

NFPA101 requires that Emergency Lighting Equipment be tested on a monthly basis for a period of at least 5 seconds, 

and a minimum of 90 minutes once a year. We strongly recommend these guidelines be followed to insure system 

readiness, and to prolong battery life. The 

LG

 system was designed with a front panel test switch to facilitate monthly 

testing. Simply depress the button and hold to test the inverter at anytime. Once released, the 

LG

 will revert back to 

standby operation. For annual 90-minute discharge or other prolonged tests, simply turn off the AC Input breaker at the 

service panel.

Содержание LG125R

Страница 1: ...r 125VA 110W 250VA 220W Mini Inverter Power Systems Models LG125S Surface Mounted Version LG125R Recessed Wall Mounted Version LG125T Recessed Ceiling T Grid Mounted Version LG250S Surface Mounted Ver...

Страница 2: ...uipment should be mounted in locations where it will not be readily subjected to tampering by unauthorized personnel 7 The use of accessory equipment not recommended by the manufacturer may cause an u...

Страница 3: ...Output Connections 8 Wiring Diagram 1 120VAC Connections 9 Wiring Diagram 2 277VAC Connections 9 106 Battery Information 10 106 1 Tools 10 106 2 Battery Installation and Connections 10 Wiring Diagram...

Страница 4: ...solator Standard battery Sealed lead calcium 10 year life Battery voltage 24 or 48 system dependent See Table 1 below Runtimes 90 minutes standard Operating temperature 20 C to 30 C 68 F to 86 F Relat...

Страница 5: ...ent caps and into the air Do not allow smoking sparks or flames in battery storage location because hydrogen is concentrated under the vent cap of each cell of the battery Hydrogen is highly explosive...

Страница 6: ...its and damage the equipment NOTE Consider unit knockout locations prior to mounting unit Allow room for easy routing of conduit to entry point 104 4 Surface Mount Models LG125S LG250S and LG250SI 1 R...

Страница 7: ...ent of unit cover the LED indicator panel assembly position must be adjusted to sit flush against inside surface of cover after attachment This is accomplished using the 2 8 32 hex nuts on the indicat...

Страница 8: ...Switch S2 is in the OFF position 2 Make sure the LG inverter system input and output voltages are correct for the particular application Remember that the LG system provides single phase power only 3...

Страница 9: ...77V wiring Normally On and Normally Off Operation A combination of the operating modes described above See C in Wiring Diagram 1 for 120V wiring or G in Wiring Diagram 2 for 277V wiring Switched Load...

Страница 10: ...void electric shock and burns caused by contacting battery terminals or shorting terminals during battery installation Do not touch uninsulated battery terminals 8 A qualified electrician who is famil...

Страница 11: ...rrect polarity on the battery terminals Polarity markings may vary from battery to battery Battery Wiring Diagram 1 Battery Wiring Diagram 2 Battery Wiring Diagram 3 106 3 Battery Connection Voltage C...

Страница 12: ...en to follow the steps below in their exact sequence Failure to do so may result in possible equipment failure CAUTION Familiarize yourself with the shut down procedure in Section 200 1 before proceed...

Страница 13: ...s a service alert Refer to the INDICATION chart in Section 110 2 for details During loss of normal utility power the dual color LED will not be illuminated The AMBER INV ON LED indicator will be illum...

Страница 14: ...ded if not routinely recharged NOTE To turn power back on follow the System Start up Procedure outlined in Section 108 Be sure to complete all of the steps to assure the unit will operate properly 200...

Страница 15: ...stem and to maintain proper charger operation replace spent batteries only with cells having the same part number voltage and ampere hour rating as the original batteries 1 Follow the proper shut down...

Страница 16: ...Hubbell Lighting Inc brand with representatives offices in principal cities throughout North America Copyright Hubbell Lighitng Inc All Rights Reserved Specifications subject to change without notice...

Отзывы: