![DSC FSD-100 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/dsc/fsd-100/fsd-100_user-manual_2534835009.webp)
5
Powering Down:
The tester can be powered down in two ways:
1.
The unit will automatically power down 4 minutes after the last keypress
regardless of the screen it is currently in.
2.
Pressing the scroll key
5 times from the Ready mode screen will dis-
play the "Press
for Power Down" screen. Press the
key twice to
power down or press
to return to the Ready screen.
Figure 2 - Power Up and Main Flow Menu
NOTE:
Pressing the
key will scroll through the menu in the sequence
indicated. To scroll in the reverse direction use the
key.
SAVE
Press the
,
,
or
key
for 2 seconds to power up.