SBAR25
25.276in
642mm
11.811in
300mm
749.50mm
29.508in
130mm
5.118in
67.11mm
2.642in
Step 1: Remove Soundbar and ALL hardware from the packing
Step 2: Find a good location that allows for easy wiring of the speaker (and LED lights)
Plus does not impair your movement around the location
Step 3: Choose the first or second installation
Step 4: First installation,use M8-15 locking the base bracket.
Step 5: Pull the U-Ring into the tube .
Step 6: Put the M8-55 screw into the base
and U-Ring hole.
Step 7: Use the M8 nut locking until the soundbar is locked in place
Step 8: Second installation, find the right way and mark the drill hole location,
drill D8.5-D9 hole.
Step 9: Adjust the soundbar angle, use the 6mm hex wrench locking.
Step 10: The mouting parts and detail please look the TYPE 1 & TYPE 2 view show .
Step 11: Connect the red, green, blue & black to LED controller or battery,
choose the color you want
Step 12: Connect the speaker wire to stereo AMP.
TYPE 1
TYPE 2
DIMENSIONS
INSTALLATION
Mounting