
/ INSTALACIÓN
BEGINNING MOUNTING
Step 1: Remove tower speakers from the packaging
and ALL hardware.
Step 2: Find a GOOD location that allows for easy
wiring of the speaker (and LED lights) -PLUS does
NOT impair your movement around the location.
Step 3: Using the supplied 6mm hex wrench spin
out the 4-M8 screw that holds the top clamp
Step 4: Drill 15 - 20 mm hole on mounting tube
bottom align the clamp wire out hole.
Step 5: Connect the speaker wire AMP out and LED
controller, Insulated lock the clamp to the tube.
Step 6: Cut the length of the rubber pad and wires
outlet according to the diameter of the installation
pipe.
COMENZANDO EL MONTAJE
Paso 1: Retire los altavoces de torre del embalaje y TODO
el hardware.
Paso 2: Encuentre una BUENA ubicación que permita el
cableado fácil del altavoz (y las luces LED) - ADEMÁS QUE
NO perjudique su movimiento alrededor de la ubicación.
Paso 3: Con la llave hexagonal de 6 mm suministrada,
gire el tornillo 4-M8 que sujeta la abrazadera superior.
Paso 4: Perfore un orificio de 15ø - 20ø mm en la parte
inferior del tubo de montaje y alinee el orificio de salida
del cable de la abrazadera.
Paso 5: Conecte el cable de salida AMP del altavoz y el
controlador LED, trabe la abrazadera aislada al tubo.
Paso 6: Corte la longitud de la almohadilla de goma y la
salida de los cables de acuerdo con el diámetro de la
tubería de instalación.
304 pernos M8 con
arandela de tope de resorte
Llave hexagonal
de 6 mm
Cable de 6 hilos
Soldadura, tubo termorretráctil
cables de altavoz
Paso 3
Paso 6
Paso 4
Paso 5
1.0”
RUBER PAD FOR TUBE
1.25”
1.5”
1.75”
2.0”
2.25”
2.5”
2.75”
3.0”
Содержание CF-X8TP
Страница 12: ...PARA M S INFORMACI N POR FAVOR VISITE DS18 COM...