
Savannah Installation and Operation Manual
47
Appendix 4: Installation of Secondary Air Tubes and Baffle
1- Starting with the rear tube, lean
and insert the right end of the
secondary air tube into the rear
right channel hole. Then lift and
insert the left end of the tube into
the rear left channel.
2- Align the notch in the left end of
the tube with the key of the left air
channel hole. Using a « Wise
grip » hold the tube and lock it in
place by turning the tube as shown
in detail A. Make sure the notch
reaches the end of the key way.
3- Repeat step 1 and 2 for the other
secondary air tubes.
4- To remove the tubes use the
above steps in reverse order.
Содержание Savannah DB03025
Страница 8: ...Savannah Installation and Operation Manual 8...
Страница 32: ...Savannah Installation and Operation Manual 32 Clearances for shield construction...
Страница 43: ...Savannah Installation and Operation Manual 43 Installation on the bottom AC01336...
Страница 49: ...Savannah Installation and Operation Manual 49 Appendix 5 Exploded Diagram and Parts List...