background image

Page 9

Installation and Operation Requirements - Deco Alto

ENGLISH

2.4  EPA Loading

The loading methods shown below are those that were used during emissions certification.

2.4.1  Air control

The air control is located underneath the ash shelf. 
To open the air control, pull the air control handle 
completely (High). This will increase the burn rate. 
To close the air control, push the air control handle 
completely (Low). This will decrease the burn rate. 

2.4.2  High burn rate (primary air control open)

Open the air control completely. Place height small 
pieces (2" x 2") of wood in the firebox crossing them 
at the greatest possible angle. Criss cross 10 to 16 
kindling wood pieces on the small pieces of wood in 
three layers at the greatest possible angle. Tie knot 
with five sheets of paper and place them on top of the 
kindling wood. Light up the paper and let the door ajar 
at 90° until all the kindling wood is on fire and the first 
row of small pieces of wood is on fire too. Close the 
door. When there is no more fire in the front of the firebox and there are only faint flames on the 
wood in the back of the firebox, break ashes, level the coal bed and put five logs in the firebox. 
Put 3 pieces on the coal bed, without air space between them. Leave one inch of air space 
between the rear firebrick and the first piece. The two other pieces should be added on top of 
the first 3, in an East-West configuration.  Let the door ajar to leave a space of one inch on the 
door handle’s side for 1 minute maximum and then close the door. 

2.4.3 

Medium and low burn rate

On a two inches thick coal bed that is still red, place three logs in an East-West orientation. 
There should be air space between each log and between the logs and the bricks. The two other 
pieces should be added on top of the first three, slightly angled of 20°. Let the door ajar at 90° 
for approximately 5 min. Then, close the door with the primary air control open. Leave to burn 
with the primary air control open for approximately 10 more minutes and then close the primary 
air control completely for the low burn rate and halfway for the medium burn rate. For better 
results, close the air control gradually from the closing of the door to the complete closing of 
the air control

Содержание DB03220

Страница 1: ...dards by an accredited laboratory US Environmental Protection Agency phase II certified wood stove compliant with 2020 cord wood standard CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AN...

Страница 2: ...lishes the warranty period If it can not be provided the warranty period will be determined by the date of manufacture of the product It is also highly recommended to register the warranty online at h...

Страница 3: ...ducing Wall and Ceiling Clearances Safely 18 5 1 Shield Construction Rules 18 6 Installation of options on your product 21 6 1 Optional Fresh Air Intake Kit Installation 21 6 2 Optional Fire Screen In...

Страница 4: ...Page 4 Installation and Operation Requirements Deco Alto ENGLISH 1 CERTIFICATION PLATE...

Страница 5: ...um acceptable temperature in the designated area in case of a power failure 2 The overall firebox calculation is an approximation and is not intended to be used for loading This volume includes a buff...

Страница 6: ...ULC S627 1 North south ends of the logs visible East west sides of the logs visible 2 Mobile homes Canada or manufactured homes USA The US Department of Housing and Urban Development describes manufac...

Страница 7: ...5 8 651mm O 6 153mm Figure 1 Top View 22 3 4 578mm 16 3 4 425mm 10 1 4 260mm 17 1 8 435mm 12 1 8 307mm 21 3 8 543mm 26 1 2 674mm 7 3 8 188mm 12 7 8 325mm 25 5 8 651mm O 6 153mm 22 3 4 578mm 16 3 4 42...

Страница 8: ...H 2 3 2 Combustion Chamber Dimensions 17 1 2 444mm 9 227mm Figure 4 Door Opening 21 533mm 5 16 8mm 3 16 5mm 11 7 8 303mm 16 1 2 419mm 21 533mm 5 16 8mm 3 16 5mm 11 7 8 303mm 16 1 2 419mm Figure 5 Fron...

Страница 9: ...e front of the firebox and there are only faint flames on the wood in the back of the firebox break ashes level the coal bed and put five logs in the firebox Put 3 pieces on the coal bed without air s...

Страница 10: ...learances of the appliance and the flue pipes must be met individually meaning the appliance cannot be installed closer to the combustible materials than the single or double wall pipe allows For a sa...

Страница 11: ...11 Installation and Operation Requirements Deco Alto ENGLISH A B E D CAN 48 122 cm US 36 92 cm 48 Flush F F C Figure 7 Clearances Top Figure 8 Clearances Corner 84 213 cm Ve Ho N Figure 9 Clearances...

Страница 12: ...m 6 159 mm B 4 102 mm 4 102 mm E 13 337 mm 13 337 mm C 3 76 mm 3 76 mm F 12 318 mm 12 318 mm A B E D CAN 48 122 cm US 36 92 cm 48 Flush F F C If the clearance reduction is on the same side as the door...

Страница 13: ...mm 12 305 mm L 77 196 cm 77 196 cm If the above clearances are met then the distances measured from the flue outlet will be DISTANCES1 FROM PIPE CONNECTOR WITH SINGLE WALL PIPE CONNECTOR DISTANCES1 F...

Страница 14: ...IANCE CLEARANCES WITH DOUBLE WALL PIPE CONNECTOR Canada USA A 5 127 mm 5 127 mm B 6 152 mm 6 152 mm C 5 127 mm 5 127 mm L 80 203 cm 80 203 cm Ve Ho L DISTANCES1 FROM PIPE CONNECTOR WITH DOUBLE WALL PI...

Страница 15: ...2 311 mm 12 311 mm E 32 819 mm 32 819 mm A B E D K E B 3 1 5 Mobile Home It is strictly forbidden to install a unit with a single wall pipe in a mobile home APPLIANCE CLEARANCES WITH DOUBLE WALL PIPE...

Страница 16: ...CONNECTOR DISTANCES1 FROM PIPE CONNECTOR WITH DOUBLE WALL PIPE CONNECTOR Canada USA Canada USA A 3 76 mm 3 76 mm D 6 159 mm 6 159 mm B 6 152 mm 6 152 mm E 15 387 mm 15 387 mm C 3 76 mm 3 76 mm F 12 31...

Страница 17: ...49 mm T 33 851 mm 26 673 mm U 41 1057 mm 32 832 mm V 68 1734 mm 53 1365 mm H I G J K S Figure 10 Floor Protection U T V 84 213 cm Ve Ho N 1 In Canada to comply with CSA B365 Installation Code for Soli...

Страница 18: ...in this case the same clearances as a certified double wall pipe connector can be used Refer to the booklet in the screen options to obtain the dimensions to be respected 5 1 Shield Construction Rule...

Страница 19: ...age 19 Installation and Operation Requirements Deco Alto ENGLISH Figure 11 Heat shield clearances Figure 12 Heat shield clearances H H Figure 13 Heat shield clearances Figure 14 Heat shield clearances...

Страница 20: ...l on non combustible board spaced out at least 1 25 mm by non combustible spacers 50 18 457 mm 33 24 610 mm Ceramic tiles or equivalent non combustible material on non combustible board with a minimum...

Страница 21: ...ptional Fresh Air Intake Kit Installation This mobile home approved stove requires the installation of a fresh air intake kit A and an insulated fresh air intake pipe HVAC type must meet ULC S110 or U...

Страница 22: ...een is prohibited It is prohibited to use this wood stove with a fire screen in a mobile home 1 Open the door 2 Hold the fire screen by the two handles and bring it close to the door opening 3 Lean th...

Страница 23: ...he instructions provided with the thermodisc for more details 1 Remove the backplate by cutting the knockouts with pliers 2 Screw the blower D in place using the screws C included in the installation...

Страница 24: ...en lift and insert the left end of the tube into the rear left channel 2 Align the notch in the left end of the tube with the key of the left air channel hole Using a Wise grip hold the tube and lock...

Страница 25: ...n and Operation Requirements Deco Alto ENGLISH Note that secondary air tubes B can be replaced without removing the baffle board A and that all tubes are not necessarely identical look at the part num...

Страница 26: ...ion Requirements Deco Alto ENGLISH 6 5 Mobile Home Installation THE IMAGES SHOWN ARE FOR GUIDANCE ONLY AND MAY BE DIFFERENT FROM YOUR PRODUCT BUT THE ASSEMBLY REMAINS THE SAME Screw the base on the fl...

Страница 27: ...ler to obtain a genuine replacement part To remove or replace the glass D THE IMAGES SHOWN ARE FOR GUIDANCE ONLY AND MAY BE DIFFERENT FROM YOUR PRODUCT BUT THE ASSEMBLY REMAINS THE SAME E D C A B 1 Re...

Страница 28: ...7 Pinch the gasket onto the glass in a U shape all around the glass By following these instructions the edge clearances are maintain 7 3 Door In order for the stove to burn at its best efficiency the...

Страница 29: ...crews located on the lower and upper hinges of the door using a 3 32 Allen key to free the adjustable hinge rods Using a flat screwdriver turn the adjustable hinge rods in the direction shown to adjus...

Страница 30: ...asket from the door Use a screwdriver to scrape the old gasket adhesive from the door gasket groove 3 Apply a bead of approximately 3 16 5 mm of high temperature silicone in the door gasket groove Sta...

Страница 31: ...ion Requirements Deco Alto ENGLISH 8 Exploded Diagram and Parts List 6 1 2 3 4 5 7 8 9 10 11 12 13 14 15 17 16 18 19 20 20 20 21 19 20 20 20 19 20 20 20 19 20 20 20 21 20 20 21 23 22 26 25 27 28 29 30...

Страница 32: ...REWS 12 PER KIT 1 11 SE74183 GLASS WITH FRAME AND RETAINERS 1 12 30507 BLACK TORX SCREW WITH FLAT HEAD TYPE F 1 4 20 X 3 4 3 13 PL74181 AIR CONTROL HOUSING PLATE 1 14 PL74180 ASH SHELF 1 15 PL74184 AS...

Страница 33: ...tallation and Operation Requirements Deco Alto ENGLISH Item Description Qty 36 30898 ROUND WOODEN BLACK HANDLE 2 37 30187 STAINLESS WASHER ID 17 64 X OD 1 2 2 38 30025 1 4 20 X 1 2 PAN HEAD QUADREX BL...

Страница 34: ...manufacturer at its discretion may decide to repair or replace any part or unit after inspection and investigation of the defect The manufacturer may at its discretion fully discharge all obligations...

Страница 35: ...Page 35 Installation and Operation Requirements Deco Alto ENGLISH...

Страница 36: ...al com This document is available for free download on the manufacturer s website It is a copyrighted document Resale is strictly prohibited The manufacturer may update this document from time to time...

Отзывы: