background image

Page 23

Installation and Operation Manual - Escape 1200

ENGLISH

6.1  Optional Fresh Air Intake Kit Installation

THE IMAGES SHOWN ARE INDICATIVE ONLY AND MAY DIFFER OF YOUR PRODUCT, BUT THE 

ASSEMBLY REMAINS THE SAME.

This mobile home approved stove requires the installation of a fresh air intake kit 

(A)

 and an 

insulated fresh air intake pipe (HVAC type, must meet ULC S110 or UL 181 class 0 or class 1) 

(B)

sold separately. Refer to air intake kit installation instructions for more details.

A

B

Содержание DB03182

Страница 1: ...d UL 737 standards by an accredited laboratory US Environmental Protection Agency phase II certified wood stove compliant with 2020 cord wood standard CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS IN LOCAL AREA READ THIS ENTIRE MANUAL BEFORE INSTALLATION AND USE OF THIS WOOD STOVE FAILURE TO FOLLOW THESE INSTRUCTIONS COULD RESULT IN PROPERTY D...

Страница 2: ...ablishes the warranty period If it can not be provided the warranty period will be determined by the date of manufacture of the product It is also highly recommended to register the warranty online at https www drolet ca en warranty warranty registration Registering the warranty will help to quickly find the information needed on the unit Dealer Installer Phone Number Serial Number ...

Страница 3: ...ield AC02762 and Lowered Ceiling 15 3 1 4 Inside a Combustible Alcove 16 3 1 5 Mobile Home 16 3 1 6 Mobile Home With Heat Shield AC02762 17 4 Floor Protection 18 5 Reducing Wall and Ceiling Clearances Safely 19 5 1 Shield Construction Rules 19 6 options installation on your product 22 6 1 Optional Fresh Air Intake Kit Installation 23 6 2 Optional Fire Screen Installation 24 6 3 Optional Blower And...

Страница 4: ...Page 4 Installation and Operation Manual Escape 1200 ENGLISH 1 CERTIFICATION PLATE ...

Страница 5: ...Page 5 Installation and Operation Manual Escape 1200 ENGLISH ...

Страница 6: ...defined by the manufacturer as its capacity to maintain a minimum acceptable temperature in the designated area in case of a power failure 2 The maximum heat output dry cordwood is based on a loading density varying between 15 lb ft and 20 lb ft and reloading intervals ranging from 60 to 120 minutes Other performances are based on a fuel load prescribed by the standard without any reloading betwee...

Страница 7: ...S627 11 North south ends of the logs visible East west sides of the logs visible 12 Mobile homes Canada or manufactured homes USA The US Department of Housing and Urban Development describes manufactured homes better known as mobile homes as follows buildings built on fixed wheels and those transported on temporary wheels axles and set on a permanent foundation In Canada a mobile home is a dwellin...

Страница 8: ...0 ENGLISH 2 3 Dimensions 2 3 1 Stove Dimensions 9 1 4 235mm 18 1 2 470mm 6 5 8 170mm 6 153mm Figure 1 Top View 15 3 4 400mm 8 1 2 216mm 10 1 4 260mm 30 1 8 766mm 28 1 8 715mm 28 7 8 732mm 20 5 8 523mm 22 3 4 578mm Figure 2 Front View Figure 3 Side View ...

Страница 9: ...anual Escape 1200 ENGLISH 2 3 2 Combustion Chamber Dimensions 7 5 8 195mm 12 305mm Figure 4 Door Opening 14 1 4 360mm 11 3 4 298mm 19 1 8 484mm 1 4 6mm 3 16 5mm Figure 5 Front View Combustion Chamber Figure 6 Side View Combustion Chamber ...

Страница 10: ...ire too Close the door When there is no more fire in the front of the firebox and there are only faint flames on the wood in the back of the firebox break ashes level the coal bed and put four logs in the firebox Place the biggest log about 5 x5 and a medium log about 4 x4 on the coal bed with a north south orientation Place two other medium logs on the first two with the greatest possible angle T...

Страница 11: ...e flue pipes must be met individually meaning the appliance cannot be installed closer to the combustible materials than the single or double wall pipe allows For a safe way to reduce clearances refer to section 5 Reducing Wall and Ceiling Clearances Safely 3 1 Clearances APPLIANCE CLEARANCES WITH SINGLE WALL PIPE CONNECTOR APPLIANCE CLEARANCES WITH DOUBLE WALL PIPE CONNECTOR Canada USA Canada USA...

Страница 12: ...age 12 Installation and Operation Manual Escape 1200 ENGLISH A B E D CAN 48 122 cm US 36 92 cm 48 Flush F F C Figure 7 Clearances Top Figure 8 Clearances Corner 84 213 cm Ve Ho N Figure 9 Clearances Side ...

Страница 13: ... 146 mm 5 146 mm B 2 64 mm 2 64 mm E 8 210 mm 8 210 mm C 2 64 mm 2 64 mm F 9 229 mm 9 229 mm A B E D CAN 48 122 cm US 36 92 cm 48 Flush F F C If the clearance reduction is on the same side as the door handle position the stove at a minimum of 6 inches from the side wall clearance B otherwise it may be located at the clearance shown in the table above 15 Note that to reduce the clearances of an app...

Страница 14: ...mm 8 203 mm L 72 1829 mm 72 1829 mm If the above clearances are met then the distances measured from the flue outlet will be DISTANCES17 FROM PIPE CONNECTOR WITH SINGLE WALL PIPE CONNECTOR DISTANCES17 FROM PIPE CONNECTOR WITH DOUBLE WALL PIPE CONNECTOR Canada USA Canada USA D 18 457 mm 18 457 mm D 9 235 mm 9 235 mm E 26 673 mm 26 673 mm E 23 603 mm 23 603 mm F 18 464 mm 18 464 mm F 14 368 mm 14 36...

Страница 15: ...d APPLIANCE CLEARANCES WITH DOUBLE WALL PIPE CONNECTOR Canada USA A 2 64 mm 2 64 mm B 2 64 mm 2 64 mm C 2 64 mm 2 64 mm L 72 1829 mm 72 1829 mm Ve Ho L DISTANCES18 FROM PIPE CONNECTOR WITH DOUBLE WALL PIPE CONNECTOR Canada USA D 5 146 mm 5 146 mm E 8 210 mm 8 210 mm F 9 229 mm 9 229 mm A B E D CAN 48 122 cm US 36 92 cm 48 Flush F F C If the clearance reduction is on the same side as the door handl...

Страница 16: ...9 235 mm 9 235 mm E 25 654 mm 25 654 mm A B E D K E B 3 1 5 Mobile Home It is strictly forbidden to install a unit with a single wall pipe in a mobile home APPLIANCE CLEARANCES WITH DOUBLE WALL PIPE CONNECTOR DISTANCES19 FROM PIPE CONNECTOR WITH DOUBLE WALL PIPE CONNECTOR Canada USA Canada USA A 6 152 mm 6 152 mm D 9 235 mm 9 235 mm B 22 559 mm 22 559 mm E 27 705 mm 27 705 mm C 10 254 mm 10 254 mm...

Страница 17: ... 3 76 mm D 6 159 mm 6 159 mm B 3 76 mm 3 76 mm E 8 222 mm 8 222 mm C 3 76 mm 3 76 mm F 9 241 mm 9 241 mm A B E D CAN 48 122 cm US 36 92 cm 48 Flush If the clearance reduction is on the same side as the door handle position the stove at a minimum of 6 inches from the side wall clearance B otherwise it may be located at the clearance shown in the table above 20 Les distances de tuyau listées dans ce...

Страница 18: ...s falling through to the combustible floor if cracks or separation should occur in the finished surface Check local codes for approved alternatives No protection is required if the unit is installed on a non combustible floor ex concrete FLOOR PROTECTION Canada USA G21 8 203 mm N A H 8 203 mm N A I 18 457 mm From door opening 16 203 mm From door opening J N A 8 203 mm K 34 876 mm 31 794 mm N22 N A...

Страница 19: ...gnite or lose adhesive qualities at temperatures likely to be encountered Mounting hardware which extends from the shield surface into combustibles may be used only at the edges of the shield Mounting hardware must allow full vertical ventilation A Minimum clearance between the appliance top and an unshielded combustible ceiling for a ceiling 72 from the floor 43 7 8 1114 mm B Shield extension abo...

Страница 20: ...Page 20 Installation and Operation Manual Escape 1200 ENGLISH H H Figure 13 Heat shield clearances Figure 14 Heat shield clearances ...

Страница 21: ... on non combustible board spaced out at least 1 25 mm by non combustible spacers 50 18 457 mm 33 24 610 mm Ceramic tiles or equivalent non combustible material on non combustible board with a minimum of 24 gauge 0 61 mm sheet metal backing spaced out at least 1 25 mm by non combustible spacers 67 12 305 mm 50 24 610 mm Brick spaced out at least 1 25 mm by non combustible spacers 50 18 457 mm N A N...

Страница 22: ...Page 22 Installation and Operation Manual Escape 1200 ENGLISH 6 OPTIONS INSTALLATION ON YOUR PRODUCT ...

Страница 23: ... ONLY AND MAY DIFFER OF YOUR PRODUCT BUT THE ASSEMBLY REMAINS THE SAME This mobile home approved stove requires the installation of a fresh air intake kit A and an insulated fresh air intake pipe HVAC type must meet ULC S110 or UL 181 class 0 or class 1 B sold separately Refer to air intake kit installation instructions for more details A B ...

Страница 24: ...hibited It is prohibited to use this wood stove with a fire screen in a mobile home 1 Open the door 2 Hold the fire screen by the two handles and bring it close to the door opening 3 Lean the upper part of the fire screen against the top door opening making sure to position the top fire screen brackets behind the primary air deflector 4 Lift the fire screen upwards and push the bottom part towards...

Страница 25: ...modisc allows the blower to operate only when the stove is hot enough See the instructions provided with the thermodisc for more details 1 Remove the backplate by cutting the knockouts with pliers MICROJOINT 2 Screw the blower D in place using the screws C included in the installation manual Screw the thermodisc A with the screws B supplied with the thermodisc on the back of the stove Ensure that ...

Страница 26: ...n lift and insert the left end of the tube into the rear left channel 2 Align the notch in the left end of the tube with the key of the left air channel hole Using a Vise grip hold the tube and lock it in place by turning the tube as shown Make sure the notch reaches the end of the key way 3 Put the baffle in place 4 Repeat steps 1 and 2 for the three other tubes 5 To remove the tubes use the abov...

Страница 27: ...tion and Operation Manual Escape 1200 ENGLISH Note that secondary air tubes B can be replaced without removing the baffle board A and that all tube are not necessarely identical look at the part number on the tube B A ...

Страница 28: ... Operation Manual Escape 1200 ENGLISH 6 5 Mobile Home Installation THE IMAGES SHOWN ARE INDICATIVE ONLY AND MAY DIFFER OF YOUR PRODUCT BUT THE ASSEMBLY REMAINS THE SAME Screw the base on the floor with the proper hardware O O ...

Страница 29: ...place the glass D THE IMAGES SHOWN ARE INDICATIVE ONLY AND MAY DIFFER OF YOUR PRODUCT BUT THE ASSEMBLY REMAINS THE SAME E D C A B 1 Remove the door E from its hinges and lay it on a soft flat surface 2 Remove the eight screws A the eight glass retainers B and the metal frames C 3 Remove the glass D If it is damaged install a new one in place The replacement glass must have a gasket all around see ...

Страница 30: ...inch the gasket onto the glass in a U shape all around the glass 7 3 Door In order for the stove to burn at its best efficiency the door must provide a perfect seal with the firebox The tightness of the door seal can be verified by closing and latching the door on a strip of paper The test must be performed all around the door If the paper slips out easily anywhere either adjust the door or replac...

Страница 31: ...loosen the pressures screws located on the lower and upper hinges of the door using a 3 32 Allen key to free the adjustable hinge rods Using a flat screwdriver turn the adjustable hinge rods in the direction shown to adjust the doors Tighten all door hinge pressure screws when they are at the desired positions Configurations 1 2 3 4 5 6 show in which direction these act on the adjustment of the do...

Страница 32: ...sket from the door Use a screwdriver to scrape the old gasket adhesive from the door gasket groove 3 Apply a bead of approximately 3 16 5 mm of high temperature silicone in the door gasket groove Starting from the middle hinges side press the gasket into the groove The gasket must not be stretched during installation 4 Leave about long of the gasket when cutting and press the end into the groove T...

Страница 33: ...ual Escape 1200 ENGLISH 8 Exploded Diagram and Parts List 29 30 26 27 28 25 24 23 21 22 13 12 14 20 18 19 16 17 5 6 4 3 2 1 9 9 10 10 10 10 10 10 8 10 11 11 10 10 10 10 10 32 33 31 15 6 42 34 40 39 41 38 37 36 6 48 44 45 46 47 35 6 7 43 49 ...

Страница 34: ...ORY BRICK 2 10 29015 4 X 9 X 1 1 4 REFRACTORY BRICK 12 11 29000 4 X 8 X 1 1 4 REFRACTORY BRICK 2 12 AC05959 METALLIC BLACK STOVE PAINT 342 g 12oz AEROSOL 1 13 SE46242 ESCAPE 1200 MANUAL KIT 1 14 SE74167 DOOR HINGE REPLACEMENT KIT 1 15 PL74327 DECORATIVE DASH 1 16 SE74355 ASSEMBLY AIR CONTROL HATCH KIT 1 17 30429 3 8 NICKEL COIL HANDLE 1 18 PL74265 ASH TRAY 1 19 30507 BLACK TORX SCREW WITH FLAT HEA...

Страница 35: ...4080 RHEOSTAT WITHOUT NUT MODEL KBMS 13BV 1 40 44073 CROSSFLOW BLOWER 115V 60Hz 39W 100 CFM 1 41 60013 POWER CORD 96 X 18 3 type SJT 50 pcs per carton 1 42 AC01336 5 Ø FRESH AIR INTAKE KIT FOR WOOD STOVE ON PEDESTAL 1 43 49028 5 WHITE AIR INTAKE TERMINATION 1 44 30536 LEVELING BOLT 1 4 20 X 1 4 45 30185 17 64 AA TYPE WASHER BLACK 4 46 30100 BLACK HEX NUT 1 4 20 4 47 SE74266 ESCAPE 1200 PEDESTAL AS...

Страница 36: ...anufacturer at its discretion may decide to repair or replace any part or unit after inspection and investigation of the defect The manufacturer may at its discretion fully discharge all obligations with respect to this warranty by refunding the wholesale price of any warranted but defective parts The manufacturer shall in no event be responsible for any uncommon indirect consequential damages of ...

Страница 37: ......

Страница 38: ...al com This document is available for free download on the manufacturer s website It is a copyrighted document Resale is strictly prohibited The manufacturer may update this document from time to time and cannot be responsible for problems injuries or damages arising out of the use of information contained in any document obtained from unauthorized sources ...

Отзывы: