Stream height is factory set at 35 PSI. If supply pressure varies greatly
from this, remove items 31 and 32 and adjust screw on item 34. Clockwise
adjustment will raise stream and counter-clockwise adjustment will lower
stream. For best adjustment, stream should hit basin approximately 6-1/2"
(165mm) from bubbler.
NOTE:
WHEN INSTALLING REPLACEMENT BUBBLER
AND PEDESTAL, TIGHTEN NUT (ITEM 12) ONLY
TO HOLD PARTS SNUG IN POSITION.
DO NOT OVER TIGHTEN.
BASIN
IMPORTANT
ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON
INSTALLATION OF COOLER
4) Hang the cooler on the hanger brackets. Be certain the hanger brackets are engaged properly in the frame and wrapper.
5) Remove the access panel on the underside of the cooler and set it aside.
6) Connect water inlet line--See Note 4 of General Instructions.
7) Remove the slip nut and gasket from the trap and install them on the cooler waste line making sure that the end of the waste line fits into the
trap. Assemble the slip nut and gasket to the trap and tighten securely.
START UP
Also See General Instructions
8) Replace the front panel and secure by retightening all screws.
FIG. 4
10
11
12
8
9
WRAPPER
34
32
33
31
35
36
HANGER BRACKETS AND TRAP INSTALLATION
1) Remove hanger brackets fastened to back of cooler by removing screws.
2) Mount the hanger brackets and trap as shown in Figure 2.
NOTE:
Hanger brackets and trap
MUST
be supported securely. Add fixture support carrier if wall will not provide adequate support.
IMPORTANT:
5-1/2 in. (140mm) dimension from wall to centerline of trap must be maintained for proper fit.
Anchor hanger securely to wall using all six (6) 1/4 in. dia. mounting holes.
3) Install straight valve for 3/8 in. O.D. unplated copper tube.