Dri-Air Industries HA1000B Скачать руководство пользователя страница 9

DRI-AIR

  INDUSTRIES, INC.

OPERATING MANUAL -  HA750-1500B HOT AIR  DRYERS
Revision 10/8/02

Page 9

out with compressed air. DO NOT OPERATE DRYER
WITHOUT FILTER ELEMENT INSTALLED.

Heater Maintenance

   Annually check terminal connections on each heater element

for looseness.  Ensure that they are tight to prevent overheat
conditions.

Basic Trouble-Shooting

In the unlikely event that an operating failure should arise,
take the following steps to troubleshoot the problem.

1. Blower does not rotate:

a. Check incoming power fuses or circuit breaker
b. Check all dryer fuses with multimeter.
c. Check blower overload.

2.  Inaccurate process air temperature readout:

a. Ensure thermocouple tip is situated in center of air

stream.

b. Check hose connection.
c. Check Heater ON light.

3. Air Flow Circuit:

a. Check outlet port on hopper and ensure that no material

is obstructing air flow through hopper.

b. Make sure that process air hose is properly connected,

not crushed, and free from obstructions.

c. Inspect filter and make sure cover is tight and the filter

element is clean.

4. Temperature Controller display flashing:

a. Check for open or disconnected thermocouple.
b. Temperature exceeded “High Limit”.
c. Check thermocouple location.

5.  Process Air Heaters will not actuate

a. Allow dryer to cool.  Safety snap disc may have tripped.
b. Check safety snap disc in heater box.

6. Operating Conditions:

a. Check the process temperature. It should not be set

below 125 degrees F (52 degrees C) or above 250
degrees (121 degrees C).

BASIC

TROUBLESHOOTING

Содержание HA1000B

Страница 1: ...DRI AIR INDUSTRIES INC OPERATING MANUAL HA750 1500B HOT AIR DRYERS Revision 10 8 02 Page 1 HA750B 1500B HOT AIR DRYER OPERATING MANUAL...

Страница 2: ...NG MANUAL HA750 1500B HOT AIR DRYERS Revision 10 8 02 Page 2 DRI AIR INDUSTRIES INC 16 THOMPSON ROAD P O BOX 1020 EAST WINDSOR CT 06088 1020 Tel 860 627 5110 FAX 860 623 4477 Internet http www dri air...

Страница 3: ...TS DRYER OPERATION FEATURES 4 INSTALLATION PROCEDURE 6 Electrical Connection 6 Check for correct motor rotation 6 Thermocouple Connection 6 START UP PROCEDURE 7 Set Temperature 7 DRYER OPERATION TROUB...

Страница 4: ...and should be equipped with a diffuser basket so that air flow through the hopper is not impeded To ensure proper air flow we strongly recommend that you use a Dri Air hopper described below Hopper De...

Страница 5: ...yers are designed to be portable and utilize a very compact footprint The dryer s base dimensions are typically 39 wide by 42 long by 78 high 99 1 x 106 7 x 198 1 cm The dryers are equipped to operate...

Страница 6: ...EFORE RUNNING DRYER To check blower motor rotation Turn on the power to the dryer and turn the START STOP Actuator on the dryer s electrical panel enclosure and quickly press the E STOP button Observe...

Страница 7: ...o increase temperature and down arrow to decrease temperature set point Press SET again to enter the new temperature If the upper Process Air Temperature display labeled PV flashes the temperature is...

Страница 8: ...nue to operate so that the heaterbox will not overheat and must be shut down manually with the START STOP actuator The heaters will not operate until the unit cools down Routine Maintenance Our Hot Ai...

Страница 9: ...re thermocouple tip is situated in center of air stream b Check hose connection c Check Heater ON light 3 Air Flow Circuit a Check outlet port on hopper and ensure that no material is obstructing air...

Страница 10: ...v 82683 Blower Overload 480v 84858 Blower Overload 575v 82731 Blower Overload 84857 Solid State Heater Relay 84817 IEC Contactor Blower 80576 IEC Contactor Blower 84860 IEC Contactor Heater 84818 Star...

Страница 11: ...82683 Blower Overload 480v 84858 Blower Overload 575v 82731 Blower Overload 575v 84857 Solid State Heater Relay 84817 IEC Contactor Blower 80576 IEC ConTactor 84860 IEC Contactor Heater 84818 Start C...

Страница 12: ...DRI AIR INDUSTRIES INC OPERATING MANUAL HA750 1500B HOT AIR DRYERS Revision 10 8 02 Page 12 NOTES...

Страница 13: ...DRI AIR INDUSTRIES INC OPERATING MANUAL HA750 1500B HOT AIR DRYERS Revision 10 8 02 Page 13 NOTES...

Страница 14: ...DRI AIR INDUSTRIES INC OPERATING MANUAL HA750 1500B HOT AIR DRYERS Revision 10 8 02 Page 14 NOTES...

Отзывы: