Dresser Masoneilan 10000 Series Скачать руководство пользователя страница 7

Instructions eh10000 - 06/10
10000 series Double Ported globe valves

5

Figure 7

C. 

Cut off the stem directly above the pin hole.  (see figure 6).

D. 

rethread the stem the original amount.

Note:  The  area  of  the  plug  stem  marked  X  in  Figure  8, 
serves as a guide and must be checked to ensure a close 
fit in the valve plug.

Stem 

Dia.

Hole 

Dia. "A"

"B"

"X"

Inches

in

mm

in

mm

in

mm

½

0,188

4,78

1,250

31,75

0,50

12,7

5

/

8

0,219

5,56

1,562

39,67

0,62

15,7

¾

0,250

6,35

1,875

47,63

0,75

19,1

1

0,312

7,92

2,500

63,50

1,00

25,4

Figure 8 

E. 

screw the stem solidly into the plug.

Note:  This  can  be  checked  by  measuring  the  depth  of 
the pilot recess in the plug (X in Figure 8), and making a 
reference  mark  on  the  stem  the  same  distance  from  the 
thread.  When  properly  assembled,  the  reference  mark 
should be flush with the end of the guide section.

F.  

Place the plug guide on a v block and using a suitable size 
drill, drill the stem using the hole in the plug as a guide.

G.  

remove  any  burrs  from  the  plug  guide  by  making  a  slight 
counter bore.

H.  

select the correct size pin, apply a small amount of grease 
on it and press into the hole.

Note: The pin must be recessed approximately 1/16" below 
the plug guide surface.

I. 

After the plug has been pinned it should be placed in a lathe 
to ensure it is running true.  If it is not, strike the plug with a 
soft faced mallot to straighten.

Note: The plug should be placed in a collet with the plug 
guide against it and the plug should be struck.

6.5  Packing Box

Packing  box  maintenance  is  one  of  the  principle  chores  of 
routine  servicing.  Tightness  of  the  packing  is  maintained  by 
packing  compression.  Compression  is  achieved  by  evenly 
tightening  the  packing  flanged  nuts  (2)  against  the  packing 
flange (3). Care must be taken not to over tighten, as this could 
prevent  smooth  operations  of  the  valve.  If  all  compression  is 
used up and the valve leaks, new packing is required.

valve must be isolated and pressure vented before performing 
packing box maintenance.

Proceed as follows:

A.

 loosen and remove packing flange nuts (2).

B.  

raise  packing  flange  (3)  and  packing  follower  (19)  up  the 
valve stem.

C. 

remove packing (17).

Note: Only the top pieces of the old packing are removable 
by pulling them out the top of the bonnet. To remove all the 
packing  the  bonnet  must  be  removed.  (See  appropriate 
section)

D.  

replace  packing.    As  a  rule,  2/3  of  the  packing  rings  are 
placed below the packing spacer, and 1/3 above.

Note:

 

Ensure packing is inserted with skives 90˚ apart on 

successive rings.

E. 

replace packing follower (19) and packing flange (3).

F. 

replace and tighten packing flange nuts (2).

Do not over tighten.

G.  

Put valve back in service and tighten packing only as much 
as is necessary to stop leaking.

Note: In an emergency, string packing may be used as a 
temporary repair only and must be replaced with the correct 
packing as soon as possible.

6.6  Packing Box (Optional Lubrication Figure 7)

In some applications, packing boxes are designed for use with 
a lubricator. The lubricator is provided with a ball check valve 
to  present  backflow  of  the  process  fluid.  on  some  valves,  an 
isolating  valve  (67)  is  added  for  positive  protection  against 
backflow.  The  lubricator  (66)  should  be  kept  filled  with  the 
specified  lubricant  and  turned  in  firmly  but  not  tightly.  one  or 
two turns of the lubricator once every two weeks should suffice 
to  provide  the  desired  seal.  lubricants  are  available  through 
your Masoneilan representative or District office.  replacement 
of the packing (17) is accomplished in the same manner as the 
standard lubricator box. Care must be taken to ensure that the 
latern ring (18) is in line with the lube hole located in the bonnet. 
As a rule, 2/3 of the packing rings are inserted below the lantern 
ring and 1/3 above.

Содержание Masoneilan 10000 Series

Страница 1: ...Instruction Manual EH10000 06 10 10000 Series Double Ported Globe Valves Putting You In Control ...

Страница 2: ... 3 Installation 2 4 Air Piping 2 5 Body Disassembly Refer to Figure 9 3 6 Maintenance Repair 3 6 1 Seat Ring Removal 3 6 2 Bushing Removal 3 6 3 Lapping Seats 3 6 4 Plug Stem Pinning 4 6 5 Packing Box 5 6 6 Packing Box Optional Lubrication Figure 7 5 7 Valve Body Reassembly 6 Based on general field failure data and product design analysis a useful life period of 25 years or longer can be expected ...

Страница 3: ... subject to change without prior notice The information contained in this manual in whole or part shall not be transcribed or copied without Masoneilan s written permission Please report any errors or questions about the information in this manual to your local supplier These instructions are written specifically for the 10000 Series Control Valve and do not apply for other valves outside of this ...

Страница 4: ...hat the larger of the two V notches in the plug is oriented to face the inlet of the valve 3 1 Before installing the valve in the line clean piping and valve of all foreign materials such as welding chips scale oil grease or dirt Gasket surfaces should be thoroughly cleaned to ensure leak proof joints 3 2 To allow for in line inspection maintenance and removal of the valve without service interrup...

Страница 5: ...n should be read and understood before proceeding 6 1 Seat Ring Removal Threaded seat rings 15 and 16 are installed tightly at the point of manufacture and after years of service they are often difficult to remove To facilitate removal seat ring wrenches can be fabricated to engage the seat ring lugs and adapted to a shock wrench see Figure 3 If the ring is exceptionally resistant to removal the a...

Страница 6: ...dy until it is seated G Place bonnet 6 on the body and using body stud nuts 12 spaced equally apart fasten to the body using only slight pressure and tighten evenly Do not tighten nuts to torque specifications at this time The bonnet is used temporarily for guiding purposes H Insert two or three pieces of packing 17 into the packing box to assist in guiding the stem and plug during lapping I Screw...

Страница 7: ...his could prevent smooth operations of the valve If all compression is used up and the valve leaks new packing is required Valve must be isolated and pressure vented before performing packing box maintenance Proceed as follows A Loosen and remove packing flange nuts 2 B Raise packing flange 3 and packing follower 19 up the valve stem C Remove packing 17 Note Only the top pieces of the old packing ...

Страница 8: ...es in that plug is in line with the inlet of the valve Placement of a witness mark on the stem may be helpful E Install bonnet gasket 13 bonnet 6 and loosely install body stud nuts 11 Note For ease of accessibility the bonnet should be positioned so that the packing flange studs are at right angles to the flow center line Refer to Figure 10 for proper bolt torque and tightening sequence specificat...

Страница 9: ...Instructions EH10000 06 10 10000 Series Double Ported Globe Valves 7 Figure 9 Note V Port is shown 90 out of position It must be installed as explained in Section 3 Figure 10 ...

Страница 10: ...Instructions EH10000 06 10 10000 Series Double Ported Globe Valves 8 Notes ...

Страница 11: ...Instructions EH10000 06 10 10000 Series Double Ported Globe Valves 9 Notes ...

Страница 12: ...0 5584 THE NETHERLANDS Phone 31 15 3808666 Fax 31 18 1641438 RUSSIA Veliky Novgorod Phone 7 8162 55 7898 Fax 7 8162 55 7921 Moscow Phone 7 495 585 1276 Fax 7 495 585 1279 SAUDI ARABIA Phone 966 3 341 0278 Fax 966 3 341 7624 SINGAPORE Phone 65 6861 6100 Fax 65 6861 7172 SOUTH AFRICA Phone 27 11 452 1550 Fax 27 11 452 6542 SOUTH CENTRAL AMERICA AND THE CARIBBEAN Phone 55 12 2134 1201 Fax 55 12 2134 ...

Отзывы: