background image

Rev.1.1 

3

Detailed Diagram of T b Door Components

u

 

1

3

2

4

5

6

7

8

9

10

11

12

13

14

15

 

Packing List 

 

01  Guide rail  

lat head bolt M4×10 

2pcs 

1pc 

09  F

02 Threshold 

1pc  10 Roller 

 

2sets 

03  Glass door  

1pc 

11  Guide block  

1pc 

04  Handle  

1pc 

12  Guide rail holder  

2pcs 

05 Wall 

anchor 

 

 

4pcs

13 Bumper 

Strip 

2pcs 

06  Countersunk screw ST4.2×18 

er  

2pcs 

14  Decorative cov

2pcs 

07  Round head screw ST4.2×25 

2pcs 

15  4mm hex wrench  

1pc 

08  Round head screw ST4.2×35 

4pcs 

 

 

 

 

OTE:

N

 Unpack your unit carefully and inspect it. . Lay it out and identify all parts using the 

detailed diagram and packing list in your manual as a reference. Before discarding the carton, 
check for small hardware bags that tend to fall to the bottom of the box. If any parts are 
damaged or missing, please contact DreamLine

TM

 for replacement. 

 

Содержание TORERO

Страница 1: ...e call our technical support specialists Monday through Friday 9 00AM 5 00PM EST at 1 866 731 8378 ext 3 or e mail our technical support group at support BathAuthority com DreamLineTM reserves the rig...

Страница 2: ...ons 2 If this unit is going to be installed in a new construction plumbing and drainage before installing the shower Use a competent and licensed if required by local code plumber for all plumbing ins...

Страница 3: ...2pcs 06 Countersunk screw ST4 2 18 er 2pcs 14 Decorative cov 2pcs 07 Round head screw ST4 2 25 2pcs 15 4mm hex wrench 1pc 08 Round head screw ST4 2 35 4pcs OTE N Unpack your unit carefully and inspec...

Страница 4: ...nce is marked as W W 02 have been precut for the installation between the walls with a distance of 60 If W 60 then it is unnecessary to cut the Guide rail with the Threshold and you can continue to St...

Страница 5: ...r hole which is 2 away from the end of the Threshold Drill through the two lay aluminum using the 3 16 drill bit and then enlarge the hole on its first layer with the 5 16 drill bit Apply the caulk to...

Страница 6: ...to the bottom surface of the Guide rail bracket b Measure the distance from the fron edge of the Threshold 02 to the far corner of the wall This distance is X Place another mark o the distance of X 1...

Страница 7: ...llers the end you will need to drill another hole which is 13 16 away from the end of the Guide rail S of the Guide rail 01 P ring the Guide rail over the top of the ide rail to the Guide rail ee Fig...

Страница 8: ...10 for details NOTICE Rollers 10 and fasten them with the provided bolts Install the Guid middle of the Threshold 02 Install the Handle 04 onto door using the predrilled holes with the Countersunk scr...

Страница 9: ...1 9 9 Push the Bumper strips 13 over the vertical ee Fig 11 for details Fig 11 10 Apply the silicone between the Guide rail ee Fig 12 for details Fig 12 edges of the Glass door 03 S 01 and the Shower...

Страница 10: ...any sharp or hard objects Such damage can cause either immediate or delayed breakage of tempered glass The aluminum parts of you 2 It is advisable but not necessary to wipe it with your towel after us...

Страница 11: ...or natural corrosion accident fire flood act of God or any other casualty Improper care and cleaning will void the warranty Never use cleaners containing abrasive cleansers ammonia bleach acids waxes...

Отзывы: