background image

Lift Gate Panel up 

to open

4.

Centre the gate in the opening. 

The distance from the Tension 

Knobs positioned at the bottom of 

the gate, to the walls, should be 

equal (4A).

5.

Tighten both of the Tension Knobs by 

turning them clockwise at the same 

time (5A and 5B). Note: make sure 

that the bottom of the Gate Frame 

remains completely flat on the floor. 

Ensure gate is securely fastened at 

both top and bottom.

6.

Tighten the Tension Knobs until the 2 Indicator Arrows, located on the 

Upper Locking Set and on the Right Upper Corner, align horizontally (6). 

Keep 1mm (0.04in) gap between Upper Locking Set and Upper Right 

Corner (6).

INSTALLATION

OPERATION

Distance should be equal

Tighten

inward

Tension Knob

Gate Frame

Keep this gap about 1mm (0.04in)

4A

4B

6

7. 

To open the gate:

 Slide the Gate Release Switch (7A). Lift the Gate Panel upward (7B). Gate swings open in both directions (7C).

7B

Gate Release

Switch

Slide

7A

5B

5A

Gate opens in 

both directions

7C

Отзывы: