Lift Gate Panel up
to open
4.
Centre the gate in the opening.
The distance from the Tension
Knobs positioned at the bottom of
the gate, to the walls, should be
equal (4A).
5.
Tighten both of the Tension Knobs by
turning them clockwise at the same
time (5A and 5B). Note: make sure
that the bottom of the Gate Frame
remains completely flat on the floor.
Ensure gate is securely fastened at
both top and bottom.
6.
Tighten the Tension Knobs until the 2 Indicator Arrows, located on the
Upper Locking Set and on the Right Upper Corner, align horizontally (6).
Keep 1mm (0.04in) gap between Upper Locking Set and Upper Right
Corner (6).
INSTALLATION
OPERATION
Distance should be equal
Tighten
inward
Tension Knob
Gate Frame
Keep this gap about 1mm (0.04in)
4A
4B
6
7.
To open the gate:
Slide the Gate Release Switch (7A). Lift the Gate Panel upward (7B). Gate swings open in both directions (7C).
7B
Gate Release
Switch
Slide
7A
5B
5A
Gate opens in
both directions
7C