11
SETTING WATERING SCHEDULE/CALENDAR OF “ON”
DAYS
1. Rotate the dial to “Calendar/Schedule.”
2. Choose program A, B or C. To change program
from existing program, push the PRG button.
3. The controller has 4 active day schedule options:
specific days of the week, interval watering (every
2
nd
, 3
rd
, 4
th
day), ODD or EVEN days of the month.
Only one of these schedule options is available
simultaneously for each independent program.
Each
independent
program
can
utilize
different/same schedule option.
UTILIZING THE “SPECIFIC DAYS OF THE WEEK” TO
IRRIGATE
1. Choose program A, B or C. To change program
from existing program, push the PRG button.
2. Using the + and – buttons will make a day either
active or inactive. “+” indicates an active day or
non-circled
. Press the “-” button to change to a
circled day
, which indicates an inactive day. The
days of the week will automatically advance.
3. Repeat step 2 for each day of the week. The
→
button may be used to advance to a particular day
of the week.
4. After programming days of the week as desired,
rotate dial to “RUN” to enter this new data into
controller.
UTILIZING THE “INTERVAL DAY” SCHEDULE