12
DR
®
1/2 TON VERSA TRAILER
Figure 20
Reflector Lights
Figure 18
16.
Install the Front and Rear Tailgates by aligning the Hinge Pins on the
Tailgates with the Hinge Brackets on the Frame and slide the Tailgates to the
Right (
Figure 17
).
17.
Close the Tailgates and adjust the Latches, by threading the Latching Arm
inwards or outwards to adjust the length of the Latching Arm (
Figure 18
).
18.
Secure the Tailgates by latching the adjusted Latching Arms into the Hooks
on the Bed Frame, and then push the Latch backwards to lock (
Figure 19
).
19.
Install the Reflector Lights onto the rear of the Trailer (
Figure 20
) using the
supplied M6 Lock Nuts and 10mm Socket.
20.
Torque the Lug Nuts on each Wheel to 70-80 ft-lbs using a Torque Wrench, a
5" Extension and a 21mm Socket.
21.
Check and adjust the Tire Pressures to 25-28 PSI prior to use.
Figure 17
Hinge Bracket(s)
Hinge Pin(s)
Figure 19
Содержание 1/2 TON VERSA TRAILER
Страница 21: ...CONTACT US AT www DRpower com 21 NOTES...
Страница 23: ...CONTACT US AT www DRpower com 23 Schematic DR 1 2 TON VERSA TRAILER Dump Bed Assembly 120424...
Страница 25: ...CONTACT US AT www DRpower com 25 Schematic DR 1 2 TON VERSA TRAILER Tailgate and Axle Assembly 120504...
Страница 27: ...CONTACT US AT www DRpower com 27 Schematic DR 1 2 TON VERSA TRAILER Tow Bar and Tow Hitch Assembly 120424...