7 Shut down
Dr. Födisch
Umweltmesstechnik
AG
Page 24 of 30
Operation manual PFM 92 C
Version 3.0
7 Shut
down
WARNING
Danger of burn!
The probe rod can be heated up extremely by the measuring gas! Don’t touch
the probe rod. Wear protective gloves during works at the probe.
Switch off pre-fuse
7.1 Dis-assembly
The probe is de-installed according to
Fig. 7.1:
Disassembly.
Thereby the power supply
has to be interrupted first. Then the screw is unscrewed and the probe can be taken out.
probe rod
probe head
58 mm
146 mm
300 mm
17
3
m
m
35
m
m
5 Gra
d
cable entry
flue gas
stack
2. release quick clamp
3. remove probe
(1. interrupt power supply)
Fig. 7.1:
Disassembly