28 / 96
NOTE
To prevent the transmission of piping forces and solid-borne noise, installing
expansion joints with length-limiters is recommended.
ü
The pressure booster system’s packaging has been removed.
ü
A suitable installation site has been selected that meets the requirements.
ü
Sufficient clearance in all directions is provided for servicing work.
1. Mark out the anchoring holes on the floor as shown in the outline drawing.
2. Drill the holes (max. diameter: 12 mm).
3. Insert plug fixings of appropriate size.
4. Place the pressure booster system in its correct installation position.
5. Use suitable bolts to firmly anchor the pressure booster system.
5.3 Mounting the accumulator
CAUTION
Dirt in the pressure booster system
Damage to the pump sets!
Ø
Clean the accumulator before filling it.
ü
The original operating manual of the pressure booster system is on hand.
1. Mechanically and electrically connect the accumulator in accordance with the original
operating manual supplied.
5.4 Connecting the piping
CAUTION
Air pockets in suction line
Pressure booster system cannot prime!
Ø
Lay the pipe with a continuously rising slope.
1952:116
1
Fig. 10:
Correct piping connection
1
Suction lift operation
1. Mechanically support the suction head line on site to provide for absorption of
mechanical forces.
2. Install the piping without transmitting any stresses and strains.
3. Connect the piping to the distribution lines on the inlet side and discharge side.
Содержание Hydro-Unit Premium
Страница 26: ...26 96 1 2 Fig 9 PE connection 1 Earthing terminal 2 Location of power connection ...
Страница 93: ...93 96 T Tank 80 Timers 74 W Warnings 8 Warranty claims 7 ...
Страница 94: ......
Страница 95: ......