14 / 96
3 Transport/Storage/Disposal
3.1 Checking the condition upon delivery
1. On transfer of goods, check each packaging unit for damage.
2. In the event of in-transit damage, assess the exact damage, document it and notify DP
or the supplying dealer and the insurer about the damage in writing immediately.
3.2 Transport
DANGER
Pressure booster system tipping over
Danger to life from falling pressure booster system!
Ø
Never suspend the pressure booster system by its power cable.
Ø
Do not lift the pressure booster system by its manifold.
Ø
Observe the applicable local accident prevention regulations.
Ø
Observe the information on weights, centre of gravity and fastening points.
Ø
Use suitable and permitted transport equipment, e.g. crane, forklift or pallet
jack.
ü
Transport equipment / lifting equipment suitable for the corresponding weight has been
selected and is on hand.
1. Remove the packaging. Remove the caps from the connection openings.
2. Check for any in-transit damage.
3. Transport the pressure booster system to the place of installation.
4. Detach the pressure booster system from the pallet using a suitable tool.
5. Separate the pressure booster system from the wooden skids with a suitable tool. Lift
the pressure booster system off. Dispose of the wooden skids.
6. Carefully place down the pressure booster system at the site of installation.
3.3 Storage/preservation
CAUTION
Damage during storage due to frost, moisture, dirt, UV radiation or
vermin
Corrosion/contamination of pressure booster system!
Ø
Store the pressure booster system in a frost-proof room. Do not store
outdoors.
CAUTION
Wet, contaminated or damaged openings and connections
Leakage or damage of the pressure booster system!
Ø
Only open the openings of the pressure booster system at the time of
installation.
If commissioning is to take place some time after delivery, we recommend that the following
measures be taken:
Store the pressure booster system in a dry, protected room where the atmospheric humidity
is as constant as possible.
Содержание Hydro-Unit Premium
Страница 26: ...26 96 1 2 Fig 9 PE connection 1 Earthing terminal 2 Location of power connection ...
Страница 93: ...93 96 T Tank 80 Timers 74 W Warnings 8 Warranty claims 7 ...
Страница 94: ......
Страница 95: ......