A-5
RPO3 Operation & installation manual.doc 12/18
Installation
IN GENERAL
Take off the packaging material with care. Take off all the material used for packing and accessories.
If the equipment is delivered with casters, always lock them after installation and use flexible
electrical cable wire and flexible water line hose. The appliance must secured to the building
structure with restraining device to guard against transmission of strain to the electrical cable,
water line and connectors.
1.
To the electrician
Electrical supply installation must be in accordance with the electrical rating on the nameplate.
WARNING
The electrician must make sure that the supply cable does not come in contact
with the oven top which becomes hot.
Содержание RPO3
Страница 4: ......
Страница 14: ......
Страница 18: ......
Страница 19: ...A 13 RPO3 Operation installation manual doc 12 18 NOTES...