background image

24

10 Recycle

Lithium iron batteries are recyclable, valuable resources and should be recycled according to the local laws or 

regulations. Do NOT throw your battery into household waste. 
For information on used batteries, contact the place of purchase or your battery distributor.

Содержание iPack C6.5

Страница 1: ...iPack C6 5 Lithiom Iron Phosphate Battery Residential Energy Storage System User Manual Date 2021 03 16...

Страница 2: ...ensure that you are familiar with product features functions and safety precautions as provided in this document Warning and caution messages are listed in the document to remind users installers and...

Страница 3: ...ation 7 4 Tools and Protection Equipment 8 5 Installation 9 5 1 Basic Requirements 9 5 2 Install iPack C6 5 10 5 2 1 Wall Mounted Installation 10 5 2 2 Floor Standing Installation 12 6 Electrical Conn...

Страница 4: ...entation N utilisez pas la batterie des fins non d crites dans sa documentation 3 Do not drop strike puncture or step on the battery Ne laissez pas tomber ne heurtez pas ne percez pas et ne marchez pa...

Страница 5: ...commended actions Leakage Inhalation leave the contaminated area right now Swallow induce vomiting Contact with skin wash thoroughly with soap and water Immediately seek for medical intervention after...

Страница 6: ...gested to store energy from grid to battery when electricity price is relatively lower 2 2 Product Features Compared with normal batteries the battery is characterized with better charging and dischar...

Страница 7: ...er and signal terminals Product dimensions unit mm and appearance are as shown below 766 5 475 746 5 143 133 10 11 1 2 3 4 5 6 7 9 8 12 No Label Name 1 PCS Network port for communication with inverter...

Страница 8: ...50 1 50 0 25 1 25 0 0 LED On 2 4 Technical Parameters No Items 1 Total Capacity Energy 128Ah 6 5kWh Rated Usable Capacity Energy 118Ah 6 0kWh 2 Nominal Voltage 51 2 V Operating Voltage 44 8 57 6V 3 Ma...

Страница 9: ...Temperature 20 C 45 C 6 months 30 C 20 C 45 C 60 C 7 days for shipping state Humidity 5 95 RH Within 6 month after each charge 8 RTE 94 0 2C charge discharge 25 C 9 DOD 93 10 EOL 50 SOH 5 years 11 Coo...

Страница 10: ...teries should be recharged in the following steps 1 Identify batteries that need recharging 2 3 Set CV 56 8V CC 16A 5 C 45 C 4 3 2 Safe Transportation Battery has cleared UN38 3 Section 38 3 of the se...

Страница 11: ...tion Equipment FUSED FUSED 1000V MAX 10A 100mA COM V OFF V A A V Hz Drill Tape measure Multi meter Mark pencil Hydraulic plier Wire crimper Wire stripper Wire cutter Hex key 5 Insulated gloves Safety...

Страница 12: ...d 500 Ground 5 Ground Ground Wall Wall Ground CAUTION It is recommended to build sunshade rain shelter to avoid direct exposure to sunlight and rain Wall Wall CAUTION Ensure direct contact between bat...

Страница 13: ...ing wire 1pcs Terminator 2pcs Manual 1pcs Bracket 1pcs Warranty Card 1pcs Accessory List 1pcs 5 2 1 Wall Mounted Installation Step 1 At least two persons participate the installation 1 2 The other per...

Страница 14: ...late of bracket 3 Rotate the left latch rightward until the notch locks limiting pin and rotate the right latch leftward until the notch locks limiting pin too Step 4 1 Visually inspect the two upper...

Страница 15: ...ght latc rightward until they are perpendicular to the battery 300mm 300mm 3 away Step 2 Install battery 1 Choose an alloy drill bit with a diameter of 12 mm and install it in the drill 2 3 Keep the d...

Страница 16: ...25 mm M6 HEX socket head cap screw 16 mm No PCS Link Out Link In 1 PCS RS485 B PACK CANH PACK CANH 2 PCS RS485 A PACK CANL PACK CANL 3 NC GND ISO Encode OUT Encode IN 4 PCS CANH GND ISO GND ISO 5 PCS...

Страница 17: ...k cable adopts standard 8 core cable Ensure all wires stay well aligned For Network Cable B that is used for parallel connection ensure that the wire colors are pin to pin consistent at two ends Netwo...

Страница 18: ...Network Plug Step 5 Connect power cables Plug one end of the power cables into DC breaker and plug the other end into the battery terminals WARNING A manually operating breaker should be installed be...

Страница 19: ...ery 1 to the gateway by using network cable A 2 Connect the Link Out port of Battery 1 to the Link In port of Battery 2 by using network cable B The process goes on until the last battery is connected...

Страница 20: ...17 PCS Battery 1 Battery N Junction box...

Страница 21: ...ing way 1 Push the breaker that is connected with battery to ON 2 Hold the POWER button for two seconds Power button RUN and SOC indicators turn on and indicate correct state The battery is powered on...

Страница 22: ...19 7 2 Hold the POWER button of any battery for two seconds Activate the Timing Power function and battery will power on automatically after 24 hour standy status...

Страница 23: ...rk cable from battery terminals 4 rotate latches upward and move battery 5 Two persons move battery via handles into packing case and transport battery to a designated repair site 6 Install new batter...

Страница 24: ...ttery Information SOC Bi colour BLUE RED Remark LED1 LED2 LED3 LED4 LED5 Remote LED5 depending same as the normal status Bootload 2HZ Starting Master Slave Master Slave 1 Slave 2 Slave 3 Slave 4 Slave...

Страница 25: ...uit SOC Display 1Hz Fault Three Level Cell Over Voltage Three Level Cell Under Voltage Three Level Over Temperature Three Level Under Temperature Three Level Over Current charge or discharge Three Lev...

Страница 26: ...incident caused by not obeying the Manual Before using the battery you method and scenarios If the product or accessories are damaged by incorrect using method wrong circuit does not provide any warra...

Страница 27: ...re recyclable valuable resources and should be recycled according to the local laws or regulations Do NOT throw your battery into household waste For information on used batteries contact the place of...

Отзывы: