background image

iPack C3.3 Lithium Iron Phosphate Battery

Residential Energy Storage System

User Manual

Date: 2021-03-18

5

Detect the voltage and temperature of cell, the voltage and current of battery.

SOC estimate: 

Indicate the precise volume of remaining electricity.

Alarm: 

Alarm when overvoltage, under voltage, overcurrent, over temperature or under temperature occurs.

Protection: 

Protect against over voltage, under voltage, over current, over temperature, under temperature, cell fault 

and hardware failure.

Report: 

Report alarm messages and operation data to PCS via CAN network ports.

Parallel connection: 

Support a maximum of 6 batteries in parallel connection.

Power-off triggered by fault: 

%DWWHU\SRZHUVRႇLIOHYHOWKUHHXQGHUYROWDJH9FHOORUSDUDOOHOFRQQHFWLRQIDLOXUHKDSSHQV

Forced power-off: 

When battery does not connect to mains supply, hold POWER button for two seconds and battery powers 

Rႇ

Activation: 

,QSXW9a9YLD33WHUPLQDOVEDWWHU\ZLOOEHDFWLYDWHGIURPRႇPRGHWRVWDQGE\VWDWXV

2.3 Appearance and Terminals

The battery is an energy storage unit composed of cells, mechanical parts, battery management system (BMS) 

as well as power and signal terminals. 

Table 2-1

Mechanical features

Parameter

Value

Dimension

W445*D131*H399.6 mm

Weight

Around 29kg

Installation

Rack-mounted installation or Wall-mounted bracket installation

445

399.6

131

3 4 5

1

2

6

7

8

Содержание iPack C3.3

Страница 1: ...iPack C3 3 Lithium Iron Phosphate Battery Residential Energy Storage System User Manual Date 2021 03 18...

Страница 2: ...tallation 14 3 Battery Storage and Transportation 8 3 1 Safe Storage 8 3 2 Safe Transportation 8 4 Tools and Protective Equipment 9 5 Installation 10 5 1 Inspection before Installation 10 5 2 Battery...

Страница 3: ...s functions and safety precautions as provided in this document Target Audience Installer operator commissioning personnel maintenance personnel of the RESS product Symbols and Conventions Warning and...

Страница 4: ...n aucune fa on 2 Do not use the battery for purposes not described in its documentation N utilisez pas la batterie des fins non d crites dans sa documentation 3 Do not drop strike puncture or step on...

Страница 5: ...e or property If battery is suspected to be damaged stop any operation and return it to distributor 3 Risks of fire Do not expose battery to direct sunlight Avoid contact with conductive objects such...

Страница 6: ...nighttime when there is no PV If battery energy is insufficient it can supply loads together with grid When grid falls battery and PV can power loads Battery can be charged by grid Users are suggeste...

Страница 7: ...PCS via CAN network ports Parallel connection Support a maximum of 6 batteries in parallel connection Power off triggered by fault Forced power off When battery does not connect to mains supply hold...

Страница 8: ...y 58 6Ah 3 0kWh 4 Operating Voltage 44 8 57 6V 5 Max Charging Current 7 7 7 7 7 7 LED1 LED5 LED2 LED3 LED4 6 Table 2 2 Ports and terminals No Label Name 1 Link Out Output network port for parallel con...

Страница 9: ...C 45 C within 6 months Temperature 30 C 20 C 45 C 60 C within 7 days for shipping state Humidity 5 95 RH Within 6 month after each charge 14 RTE 94 0 2C charge discharge 25 C 15 DOD 93 16 EOL 10 years...

Страница 10: ...A 5 C 45 C 4 5HFKDUJH XQWLO LFNV 3 2 Safe Transportation Battery has cleared UN38 3 Section 38 3 of the Seventh Revised Edition of the Recommendations on the Transport of Dangerous Goods Manual of Tes...

Страница 11: ...nt to ensure safety Wire stripper Wire cutter Wire crimper Hydraulic plier FUSED FUSED 1000V MAX 10A 100mA COM V OFF V A A V Hz Screwdriver Hex key Multi meter Insulated gloves Safety goggle Safety sh...

Страница 12: ...any damages on the package and the products and inspect if all accessories in the list are included If any part is missing or damaged please contact your distributor Item NO Part Name Quantity Item N...

Страница 13: ...rk Cable A Network Cable B No 10 No 11 No 12 Negative Cable No 13 Positive Cable List Crystal Head Iteam 1 iPack C3 3 2 iPack C3 3 3 iPack C3 3 4 iPack C3 3 5 iPack C3 3 6 iPack C3 3 No 1 1 2 3 4 5 6...

Страница 14: ...d 1 2 batteries 2 column holes 2 4 batteries 3 column holes 5 6 batteries 4 column holes 3 This quick guidance is based on 6 batteries 4 Positioning the hole on the wall punch hole with impact drill t...

Страница 15: ...and lock it with M5 16 bolts torque is 4NM Fixing bracket connecting plate Place connecting plate on the bracket and lock it with M5 16 bolts torque is 4NM Fix the outside battery Place the outside ba...

Страница 16: ...e junction box the horizontal hole spacing is 126mm the vertical hole spacing is 146mm the depth is 50 55mm and place the plastic expansion tube 6 30 in the hole Use M4 30 screws to fix the Junction b...

Страница 17: ...erter cable to the left right hole of the MCB respectively Fix the upper cover of the Junction box to the bottom with self tapping nails Inverter Inverter Inverter Inverter Inverter Inverter Two Batte...

Страница 18: ...twork ports Pin No PCS Link In Link Out 1 RS485_B CAN2_H CAN2_H 2 RS485_A CAN2_L CAN2_L 3 NA Ecode_IN Ecode_OUT 4 CAN0_H ISO_GND ISO_GND 5 CAN0_L Master IN Slave IN 6 NA Dry1 Dry1 7 PCS_WAKE Dry1 Dry1...

Страница 19: ...copper wires into the joint sleeve 3 Press connecting part with a hydraulic clamp 4 Tighten up sealing sealing nut and joint sleeve Step 2 Make Network Cable A 1 Strip cable sheaths for 15 0 5 mm fir...

Страница 20: ...de Wear protection equipment when wiring batteries Ensure all cables are smooth and not twisted Keep the battery in off mode and connect it in the following way Step 1 Connect network cable 1 Plug one...

Страница 21: ...nd capacity connect batteries in parallel At most 6 pcs of batteries can be connected in parallel WARNING Batteries in parallel should not have a cycle difference more than 300 Step 1 Before installin...

Страница 22: ...o the Link Out port of the first battery and the other end into Link In port of the second battery The process goes on until the last battery is connected 4 Insert a terminator a crystal plug with pin...

Страница 23: ...0V If any abnormality is detected immediately power off the battery Proceed again only after causes are confirmed 7 1 Power on Battery The battery can be powered on by either charging voltage or the P...

Страница 24: ...afety gloves 2 Turn on the breaker and hold the POWER button for three seconds to power off battery 3 Unplug power cables and network cables from battery terminals 4 Loosen the screws the battery from...

Страница 25: ...t II from the Device Type dropdown list and Extend from the Frame Type dropdown list and set Baud Rate to 500K Keep other default parameters Click OK 3 Choose target upgrade file and click Start Upgra...

Страница 26: ...Slave 1 Slave 2 Slave 3 Slave 4 Slave 5 Slave 6 Application Mode checking Parallel or single application mode checking success SOC Display Blink 5 times 2S Fault Cell Over Voltage LED5 depending on t...

Страница 27: ...sing the battery you should read the specifications safety information and operation instructions carefully to learn its application method and scenarios If the product or accessories are damaged by i...

Страница 28: ...e LED On Blue LED flash display nical Parameters ms Specifications minal Voltage V 51 2V al Capacity Energy 64Ah 3 3kWh able Rated Capacity Energy 58 6Ah 3 0kWh erating Voltage 44 8 57 6V x Charging C...

Отзывы: