![Dover Wilden Pro-Flo P4 Series Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/dover/wilden-pro-flo-p4-series/wilden-pro-flo-p4-series_engineering-operation-and-maintenance_2525079028.webp)
ASSEMBLY:
Upon performing applicable maintenance to the air
distribution system, the pump can now be reassembled.
Please refer to the disassembly instructions for photos
and parts placement. To reassemble the pump, follow
the disassembly instructions in reverse order. The air
distribution system needs to be assembled fi rst, then
the diaphragms and fi nally the wetted path. Please fi nd
the applicable torque specifi cations on this page. The
following tips will assist in the assembly process.
•
Lubricate air valve bore, center section shaft and pilot
spool bore with NLGI grade 2 white EP bearing grease
or equivalent.
•
Clean the inside of the center section shaft bushing to
ensure no damage is done to new Glyd™ ring seals.
•
A small amount NLGI grade 2 white EP bearing grease
can be applied to the muffl er and air valve gaskets to
locate gaskets during assembly.
•
Make sure that the exhaust port on the muffl er plate is
centered between the two exhaust ports on the center
section.
•
Stainless bolts should be lubed to reduce the possibility
of seizing during tightening.
•
Use a mallet to tamp lightly on the large clamp bands
to seat the diaphragm before tightening.
GLYD™ RING INSTALLATION:
PRE-INSTALLATION
•
Once all of the old seals have been removed, the inside
of the groove should be cleaned to ensure no debris
is left that may cause premature damage to the new
seals.
INSTALLATION
The following tools can be used to aid in the installation
of the new seals:
Needle Nose Pliers
Phillips
Screwdriver
Electrical
Tape
•
Wrap electrical tape around each leg of the needle
nose pliers (heat shrink tubing may also be used). This
is done to prevent damaging the inside surface of the
new seal.
•
With a new seal in hand, place the two legs of the
needle nose pliers inside the seal ring. (See Figure A.)
•
Open the pliers as wide as the seal diameter will allow,
then with two fi ngers pull down on the top portion of
the seal to form kidney bean shape. (See Figure B.)
•
Lightly clamp the pliers together to hold the seal into
the kidney shape. Be sure to pull the seal into as tight
of a kidney shape as possible, this will allow the seal to
travel down the bushing bore easier.
•
With the seal clamped in the pliers, insert the seal into
the bushing bore and position the bottom of the seal
into the correct groove. Once the bottom of the seal is
seated in the groove, release the clamp pressure on the
pliers. This will allow the seal to partially snap back to
its original shape.
•
After the pliers are removed, you will notice a slight
bump in the seal shape. Before the seal can be properly
resized, the bump in the seal should be removed as
much as possible. This can be done with either the
Phillips screwdriver or your fi nger. With either the side
of the screwdriver or your fi nger, apply light pressure
to the peak of the bump. This pressure will cause the
bump to be almost completely eliminated.
•
Lubricate the edge of the shaft with NLGI grade 2 white
EP bearing grease.
•
Slowly insert the center shaft with a rotating motion.
This will complete the resizing of the seal.
• Perform these steps for the remaining seal.
MAXIMUM TORQUE SPECIFICATIONS
Description of Part
Plastic Pumps
Air Valve
5.1 N•m (45 ft-lbs)
Outer Piston
47.5 N•m (35 ft-lbs)
Small Clamp Band
9.6 N•m (85 in-lbs)
Large Clamp Band (Rubber-Fitted)
18.6 N•m (165 in-lbs)
Large Clamp Band (PTFE-Fitted)
18.6 N•m (165 in-lbs)
Air Chamber Screws (HSFHS 3/8"-16) P4 47.5 N•m (35 in-lbs) / PX4 27.1 N•m (20 ft-lbs)
NEEDLE NOSE
PLIERS
GLYD™ RING
TAPE
Figure A
Figure B
WILDEN PUMP & ENGINEERING, LLC
26
WIL-10161-E-01
S e c t i o n 7 D
R E A S S E M B L Y H I N T S & T I P S