![Dover PSG Mouvex P BA Series Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/dover/psg-mouvex-p-ba-series/psg-mouvex-p-ba-series_installation-use-maintenance_2525022036.webp)
9.1.1 Operation of packing
The rings
629
have a static seal at the strainer
725
side
and a hydrodynamic seal at the shaft side
501
side.
The packing gland
631
must compress the rings
629
by
tightening the screws
729
while providing a slight leakage
to the outside.
The packing must always seep slightly to reduce friction
between the shaft
501
and the rings
629
and remove the
frictional heat that can cause the packing to overheat.
A seal is created by the rings
629
between the strainer
725
and the shaft
501
.
LEAKING SHAFT SEALS :
• The shaft
501
is worn on the right of the packing.
• The rings
629
are not suitable for the pumped liquid
and have been attacked chemically and/or worn away
mechanically.
9.1.2 Replacement of packing
Before any disassembly, make sure that the pump has
been drained and take all the necessary precautions to
prevent it from starting up. The pump must not start up,
even accidentally. Uncouple the pump by removing the
coupling sleeve.
Remove the pump mounting screws.
Place it on a workbench or on a flat surface free from
obstructions.
Dismantling :
• Loosen the 2 screws
729
and their square nuts
730
.
• Remove the 2 stirrups
636
.
• Free the packing gland
631
by sliding it along the shaft
501
.
• Carefully lift out the worn shaft seal.
Reassembly :
• Cut 5 rings with the diameter of the shaft from the
replacement packing.
• Insert them in the strainer
725
, one after the other,
arranging them in such a way that the joints in the rings
629
do not merge into one another. The last ring must
not protrude from the strainer.
• Put back the packing gland
631
.
• Reinstall the stirrups
636
.
• Gently re-tighten the 2 screws
729
and square nuts
730
taking care to balance up the tightening so that the
packing gland enters straight into the strainer.
• Push in the packing gland
631
just enough to prevent
substantial leakage.
• Replace the pump on the installation.
• Replace the pump mounting screws.
• Couple the pump by placing the coupling sleeve.
• Check the pump alignment (see § ALIGNMENT OF
MOTOR/PUMP AND REDUCTION GEARBOX/PUMP
SHAFTS).
• Start up the pump.
• Keep tightening the screws
729
, tightening as the new
shaft seal settles. Allow slight seepage of liquid neces-
sary for the lubrication and the cooling of the packing.
• Ascertain manually that there is no abnormal heating of
the strainer
725
due to overtightening of the packing
gland
631
. If this happens, release the shaft seal by
loosening the 2 screws
729
.
CAUTION
36/53
NT 1008-C00 07 18 P BA series e
9. SHAFT SEAL (continued)
* Loctite
®
is a registered brand.
Glued with Loctite
®
243*
View F