![Dover Hillphoenix GMD-H/DELI Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/dover/hillphoenix-gmd-h-deli/hillphoenix-gmd-h-deli_installation-and-operation-manual_2524821014.webp)
PRE-POWER CHECKLIST
Have you thoroughly examined the case for shipping damage? (see pg. 5)
Have you checked the horizontal level of the case?
(see pg. 6)
Have you applied the sealant to the end breakers of adjoining cases?
(see pg. 7)
Have you sealed the case-to-case joints by applying caulk and acrylic tape to
the end frame seam? (see pg. 7)
Have you installed the toekick? (see pg. 7)
Have you checked that all T-8 light caps and holders are positively engaged?
(see pg. 8)
After powering-up the case, be certain that all of the steps listed below have been
completed to ensure proper case functionality, safety and compliance with war-
ranty terms.
1.
Check all lights and heating elements to ensure they are all functioning
properly.
2.
Check case temperature and adjust controller as needed.
Before powering-up the case, be certain that all of the steps listed below have
been completed to ensure proper case functionality, safety and compliance with
warranty terms.
10
Содержание Hillphoenix GMD-H/DELI
Страница 2: ...ii ...
Страница 20: ...A1 Wiring Information B1 Parts List CASE INSTALLATION APPENDIX ...
Страница 21: ...A1 WIRING DIAGRAM TBD ...