Dimensions and technical information are subject to change without notice
143
Linear Slides | Maintenance and Assembly Procedure
DLB-T, A, n, u Series
For more information call us at:
1-800-ROBOHAND
or
203-261-5558
Fax:
203-452-7418
Visit us on the Internet at:
www.destaco.com
4.37
DLB-T
,A,
N,
R,
U
SERIES
MAINTENANCE
Third Angle
Projection
Seal Kit
Items
Thread
Locker
Krytox
™
Lubricant
Teflon
®
Based
Grease
Lightweight
Machine Oil
Super
Bonder
DLB-T, A, N, R, U Series Assembled View
1
4
2
8
3
30
5
7
Item Qty Name
01 1
Cylinder
02 1
Body, Internally Powered
03 2
Guide Shaft
04 2
End Block
05 1
Coupling,Externally Powered
07 4
Bushing
08 8
Shock Pad,Urethane
30 4
Dowel Pin
NOTE:
Contact the Robohand Sales
Department for a complete spare parts
list with order numbers and prices.
NOTE:
For accessory mounting, see
product data sheets.
CYLINDER VALVE
Main
Supply
Auxiliary
Supply
LOCK VALVE
5 WAY, 3 POS
3 WAY, 2 POS
G1/8
EXHAUST PORT
LOCKING CYLINDER
-R
PLUMBING DIAGRAM
(external pilot)
(internal pilot)
Lock valve must be maintained
energized during cylinder motion,
otherwise lock is engaged and
cylinder valve shifts to mid position.
Cylinder valve must be maintained
energized during extend or retract.
Also, keep energized at end of stroke
until change of direction is desired.
Mid-position of 5/3 cylinder valve
may be pressurized outlets if the
combinaton of pressure load on the
cylinder and inertia effects of the
attached load do not exceed the
holding force rating of the locking
device, including allowance for wear.
DO NOT use cylinder lines for any
logic functions - pressure levels vary
too much.
1)
2)
3)
4)
4.001-4.037RED.qxd 2/3/06 2:17 PM Page 37