background image

www.doublesight.com

STEP

3

Installation

1. Attach VESA Bracket to each monitor

2. Join Monitor to the Stand.

3. Set Monitor View Angles

Safety Note - Please hold or secure stand while installing monitors 

as stand may be unstable during assembly.

Screw VESA Bracket onto Monitors in line with back side holes 

using the provided M4-10 bolts (4 bolts per bracket).

4. Cable Management

You can now adjust the monitors to your preferred viewing angle.

17”

19”

Tighten both bolts with the wrench 

(4MM) after putting the head of the

bolts through the appropriate key 

holes as shown(  ).

100x100

75x75

Note – left monitor moves in forward angles only.

Safety Note – do not force monitors into position as this may 

damage panels.

h

ttp

://w

ww.doublesig

ht

.c

om

When adjusting the height, please

loosen the handle, set the proper 

hight and tighten the handle.

Use the provided cable ties and velcro strapping to organize video 

and power cables.

Отзывы: