![Dorner 3200 Series Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/dorner/3200-series/3200-series_installation-manual_2523154009.webp)
851-703 Rev. A
7
Dorner Mfg. Corp.
Aluminum Conveyors
Assemble
4.
Join conveyor sections and install frame connector
plates
or connector/mount brackets
on
both sides as indicated. Tighten screws to 60 in-lb (7
Nm).
Figure 6
Figure 6
5.
With a 5 mm hex-key wrench, rotate pinion gear
to tension the conveyor belt. Tighten
on both sides of
conveyor to 80 in-lb (9 Nm). For proper tensioning,
refer to “Conveyor Belt Tensioning” on page 12”.
Figure 7
Figure 7
6.
Install mounting brackets and return rollers. Refer to
“Attach Mounting Brackets” on page 7 and “Install
Return Rollers” on page 8.
7.
If equipped with cam tracking assemblies
, reposition and adjust belt tracking. Refer to
“Conveyor Belt Tracking” on page 13.
Attach Mounting Brackets
1.
Locate brackets. Exploded views shown in Figure 8 and
Figure 9.
Figure 8
Figure 8
Figure 9
Figure 9
2.
Remove screws
(Figure 8, item 1 and 2)
9, item 1 and 2)
, washers
, nuts
from
brackets.
3.
Insert T-bars
into conveyor side slots
. Fasten
to conveyor with mounting
screws
.
1
3
2
2
1
1
5
4
3
2
5
1
4
3
2
Содержание 3200 Series
Страница 2: ......