79
Crane 4000LE
07-2022
RL6002-001
Crane 4000LE Installation Manual
In-ground Motion Assist 360 drive and speed control
Remote control enclosure
Chapter 14
16.4 Install canopy glass
Fig. 16.4.1 Canopy glass installation
16.4.1 Install canopy glass.
NOTICE
Refer to Crane shop drawings for specific
canopy glass installation detail for job!
NOTICE
Installer note:
Ceiling glass must be installed with thicker glass
layer on bottom.
1. Raise first canopy glass section to installation height.
2. Position canopy glass over header bar gaskets and
muntin glazing tape.
3. Lower canopy glass onto header bar gaskets and
muntin glazing tape.
• Glass must be against muntin backer rod.
• Glass mounting holes for button head screws must
be lined up with header bar mounting holes.
4. Repeat steps 1 through 4 for second canopy glass
section.
5. Install button head screws; twp per glass section.
6. Install muntin backer rods (Fig. 16.4.2).
NOTICE
Refer to Crane shop drawings for glazing
requirements at muntin.
5
6
7
8
Fig. 16.4.2 Button head screws and muntin backer rods
3
3
3
3
6
6
Table 16.4.1 Muntin backer rod, glazing tape
3
Button head screw
5
Header gasket
6
Muntin backer rod
7
Muntin glazing tape
8
Glass, mounting hole for button head
screw