Head office:
38 Redfern St
Wetherill Park NSW 2164
Australia
Ph: 1300 132 389
Fax: 1300 652 292
www.doric.com.au
DS2500
I
FLUSH MOUNT MORTICE
SLIDING DOOR LOCK
INSTALLATION GUIDE
4
5a.
Ensure the furniture and
the lockbody are in the
unlocked position:
The sliding snib is in the
bottom position
(A)
The lockbody
tongues
are in
the retracted position
(B)
5b.
Then insert the lockbody
into the extrusion.
5c.
Fix with the 2x 10G screws.
1.
Mill the jamb using the cutout details provided
2.
Fit keeper in using the 2 x screws
3.
Adjust the keeper position through the use of
packers, and/or the adjustment screws.
4.
Close the door and test the operation.
Packer
For horizontal
adjustment
Horizontal
Adjustment Screws
Fine tune horizontal
adjustment
Vertical
Adjustment Screws
Fixing slots allow
for adjustment
STEP 5:
FITTING THE
LOCKBODY
DN1291 FLUSH KEEPER
INSTALLATION:
A
A
C
B
C
B
B
C