DORCHESTER DR-SE 18 Скачать руководство пользователя страница 14

 

HAMWORTHY HEATING LTD 

 

                          

Page

 

DORCHESTER DR-SE 

 

500001062/D 

13.4 Inspection of the Waterside Surfaces and Mag-
nesium Anode. 
 
Note: On no account remove the magnesium anode 
without checking to ensure that the heater is fully 
isolated and pressure removed. 
 
Isolate the cold feed, hot flow and circulation con-
nections and 3 way vent valve if fitted. Connect a 
hose to the drain valve at the bottom left hand side 
of the heater. Run the hose to a convenient drain 
and open drain valve. 
Ensure heater is fully drained. 
 
The heater is fitted with a single magnesium anode 
which hangs vertically within the vessel and is lo-
cated in front of the draught diverter. Release and 
unscrew the top M8 nut and remove the green/
yellow earth bonding connection between the anode 
and the tank. Release and unscrew the 1 in BSP 
cap nut which secures the anode (35 mm across 
flats) and withdraw. Examine the anode for corro-
sion and replace if the diameter has been reduced 
to less than 18 mm. When replacing the anode use 
an approved sealant for potable water systems and 
ensure the earth bonding connection is remade on 
top of the anode to ensure good electrical contact to 
the tank. Also check cleanliness of bonding connec-
tion at the tank. 

Note: 

Where access above the heater is limited, it 

may be possible to replace the solid anode with a 
more flexible segmented anode. 
 
Remove the four self-tapping screws from the circu-
lar casing inspection port located to the right of the 
gas control valve. 
 
Remove the panel and the disc of insulation be-
neath to expose the inspection port cover. Release 
and remove the eight M10 bolts and take off the 
inspection cover complete with its sealing gasket. 
Inspect the interior surfaces of the heater for depos-
its. If deposits are apparent, they can be flushed 
through the drain by a water jet applied through the 
inspection port, or the vessel can be chemically 
cleaned and flushed. After cleaning, replace the in-
spection cover with new sealing gasket. 

Note: 

On no account should a metal scraper be 

used to remove deposits since this may result in 
damage to the glass lining. 
 
13.5 Assembly Following Servicing 
 
Close drain valve and remove hose. 
 
Open the isolation valves on the heater cold feed, 
hot flow, circulation and common vent connections. 
 
Allow the system to fill with water. 
 
Check to ensure that there are no leaks from the 
anode connection and the drain valve. Check for 

leaks at the inspection port and then replace the 
insulation disc and the exterior casing panel with the 
four self-tapping screws. 
 
Slide the gas burner assembly into position beneath 
the heater and refit in the reverse order to that de-
tailed in Section 13.1. 
 
Relight burner in accordance with Section 12.3 and 
check operation of controls. 
 

Note: 

The maintenance of the water side of the sys-

tem may require additional cleaning and disinfecting 
before being placed into service Refer to BS 6700. 
 

14.0 RECOMMENDED SPARES 

 
Description   

 

 

 

Part No. 

 
Gas Control Valve (710 Minisit)  

533903039 

Overheat Safety Device 
(Limit 

Stat) 

    747433982 

Thermocouple 

   747439880 

Pilot Burner (Natural Gas) 

 

361150066 

Pilot Injector (Natural Gas) 

 

331101686 

Spark Electrode c/w Lead 

 

333805318 

Main Injector 3.5mm 
(DR-SE 18 - Nat. Gas)   

 

330513691 

Main Injector 3.8mm 
(DR-SE - Nat. Gas) 

 

 

532902033 

Inspection Port Gasket   

 

339008966 

Magnesium Anode 
(DR-SE 

18) 

    363202253 

Magnesium Anode 
(DR-SE 

20) 

    363202246 

 

15.0 OPTIONS 

 
15.1 Time Clock Control 
 
15.1.1 General 
 
A solenoid valve kit can be supplied either factory 
fitted to the heater or for site fitting which enables 
the heater to be controlled by an external source. 
HHL Part No. 563605008 
 
15.1.2 Assembly 
 
Ensure the gas supply to the heater (if connected) is 
turned off. 
Remove burner assembly as detailed in Section 
13.1. 
Disconnect thermocouple, pilot bundy tube and 
Piezo lead from gas control valve. 
Unscrew compression fitting at gas valve outlet and 
remove valve. 
Unscrew burner injector and lock nut, remove gas 
supply pipe and discard. 
Assemble the two sections of pipework supplied into 
the solenoid valve: straight pipe in valve outlet, 
curved section in valve inlet using suitable gas pipe 

Содержание DR-SE 18

Страница 1: ...TOOD BEFORE INSTALLING COMMISSIONING OPERATING OR SERVICING EQUIPMENT DORCHESTER DR SE 18 DR SE 20 P P HOT WATER STORAGE HEATERS Installation Commissioning and Maintenance Instructions Minisit 710 gas...

Страница 2: ...ating safely and efficiently Maintenance Agreements 01202 662555 Regular routine servicing of equipment by Hamworthy service engineers inspects the safety and integrity of the plant reducing the risk...

Страница 3: ...FROM LIVING ROOMS AND PROVIDED WITH APPRORIATE VENTILATION DIRECTLY TO THE OUTSIDE IF IT IS TO BE INSTALLED IN A LIVING ROOM THE HEATER MUST BE FITTED WITH AN ADDITIONAL COMBUSTION PRODUCTS DISCHARGE...

Страница 4: ...AL DATA 2 5 0 LOCATION 3 6 0 GAS SUPPLY 3 6 1 Service Pipes 6 2 Meters 6 3 Gas Supply Pipes 6 4 Boosted Supplies 7 0 FLUE SYSTEM 4 7 1 Flue Construction 7 2 Waste Gas Volume 8 0 AIR FOR COMBUSTION AND...

Страница 5: ...4 Living Space Installation FIGURES PAGE Figure No 1 Dimensioned Views 14 Figure No 2 Typical Schematic Pipework Arrangement Single Heater 15 Figure No 3 Typical Schematic Pipework Arrangement Multi H...

Страница 6: ...ximum heat transfer to water The draught diverter supplied must be fitted in an unmodified condition to the spigot around the top of the fire tubes where it provides a connection to a vertical flue Th...

Страница 7: ...arning lamp or alarm circuit For details see Section 15 2 of the manual 2 2 5 Top to Bottom Circulation In order to give enhanced temperature control to aid compliance with the HSE guidance and the DH...

Страница 8: ...e table 3 and sufficient space allowed around the heater for servicing see figure 1 The heater must normally be installed in a room separate from a living room If the heater is to be installed in a li...

Страница 9: ...as near to the chimney as possible the nearest heater being not more than 2 m away 7 1 4 The flue system must be designed to achieve a suction condition at the draught diverter at all times the heater...

Страница 10: ...ate of the heater system and any other system requirements The hot water flow pipe from each heater must be fitted with a 25 mm diameter vent pipe and a 19 mm relief valve The vent should rise to disc...

Страница 11: ...and fill the heater Open the hot water taps and allow air to escape from the system When the system is free of air close the hot water taps and check for leaks on all the water heater connections incl...

Страница 12: ...ewdriver turning the metal adjusting screw beneath clockwise to increase anti clockwise to decrease the pressure Turn control knob back to pilot only remove manometer and tighten test point screw Retu...

Страница 13: ...e burner assembly Full withdrawal may be de pendant on disconnection of cabling to solenoid valve and or pressure switch if fitted Time Clock and Flame Failure Alarm options only 13 2 Servicing Burner...

Страница 14: ...er with new sealing gasket Note On no account should a metal scraper be used to remove deposits since this may result in damage to the glass lining 13 5 Assembly Following Servicing Close drain valve...

Страница 15: ...heater with tee vertical and to the left Mark mid point of tee on 4 mm pilot supply tube and cut tube Using the nuts and olives provided insert cut ends of tube into either side of tee and tighten Lo...

Страница 16: ...water flow connection prior to any connec tion to system pipework NOTE 2 All jointing compound used should be suit able for potable water systems 15 3 2 Assembly Locate the non return valve Tee sub as...

Страница 17: ...en securing nut and replace cover knob Connect the loose end of the bridging cable to termi nal 1 of the thermostat and the thermocouple lead from the gas control valve to terminal 2 Carefully unwind...

Страница 18: ...62 D 13 15 2 An alarm raised by either the combustion products discharge safety device or the overheat safety device can be differentiated since the former is a thermal rest device and the latter has...

Страница 19: ...HAMWORTHY HEATING LTD Page DORCHESTER DR SE 500001062 D 14...

Страница 20: ...HAMWORTHY HEATING LTD Page DORCHESTER DR SE 500001062 D 15...

Страница 21: ...point 4 Gas valve control knob 5 Piezo unit button 6 Gas valve setting scale 7 Pressure regulator cover screw 8 Temperature sensing phial 9 Input pressure test point 10 Thermocouple 11 Burner feed pi...

Страница 22: ...HAMWORTHY HEATING LTD Page DORCHESTER DR SE 500001062 D 17 Fig 5a Gas Control Valve Adjustments Pilot adjustment screw Pressure adjustment screw...

Страница 23: ...ssure regula tor adjusting screw wound fully in clockwise until there is an audible click This effectively removes the pressure regulating facility the regulator being locked fully open In addition th...

Страница 24: ...ne d Ensure that the LPG reaches the heater in a fully gaseous state since liquid gas is detri mental to the control valve and results in poor combustion e Check all joints on the gas pipework includi...

Страница 25: ...ee Installation Commissioning and Maintenance Manual Appendix 3 On DRSE UV heaters the 3 4 BSP Nabic temperature and pressure relief valve is fitted in the 1 BSP socket 6 ref Figure 1 this normally be...

Страница 26: ...HAMWORTHY HEATING LTD Page DORCHESTER DR SE 500001062 D 21...

Страница 27: ...Notes...

Страница 28: ...y reserves the right to make changes and improvements which may necessitate alteration to the specification without prior notice Connect direct Direct Dial Telephone and Fax Numbers Direct Email Addre...

Отзывы: