Donaldson Torit Checker SDF Скачать руководство пользователя страница 1

Donaldson Company, Inc. © 1996

  1

ON

OFF

   This manual contains specific precautionary statements relative to worker
safety.  Read this manual thoroughly and comply as directed.  It is impossible to
list all of the potential hazards of this equipment.  Persons installing or operating
this equipment should read this manual and be instructed to conduct themselves
in a safe manner.   All electrical installation and maintenance shall be performed
by a qualified electrician.  All local electrical codes must be followed.

TORIT

®

 INSTALLATION AND

OPERATION MANUAL

IMPORTANT

PANEL

123

123

123

123

123

123

123

1234

1234

1234

1234

1234

1234

1234

1234

1234

1234

1234

1234

1234

1234

1234

1234

CLEANING FAILURE

FILTER RUPTURE

TEMPERATURE

SERVICE INTERVAL

MAINTENANCE REQUIRED

STOP

CLEAN

START
CLEAN

SERVICE

INTERVAL

CONSTANT

CLEAN

1234

1234

1234

1234

1234

12345

12345

12345

12345

12345

AIR FLOW

SET POINT INDICATOR

BLOWER OVERCURRENT

FILTER PLUGGED

SET POINT ADJUSTMENT

DOWN

TIME

CLEAN

SERVICE

INTERVAL

LIGHT

RESET

FILTER PRESSURE DROP

1234

1234

1234

1234

123

123

123

123

123

123

123

1234

1234

1234

1234

1234

1234

1234

1234

1234

1234

TORIT CHECKER

BOARD

SDF  VERSION

12345

12345

12345

12345

BLOWER

Includes Installation, Operation, and Service Instructions

IOM-71094-00

Revision A

Содержание Torit Checker SDF

Страница 1: ...TIONAND OPERATIONMANUAL IMPORTANT PANEL 123 123 123 123 123 123 123 1234 1234 1234 1234 1234 1234 1234 1234 1234 1234 1234 1234 1234 1234 1234 1234 CLEANINGFAILURE FILTERRUPTURE TEMPERATURE SERVICEINT...

Страница 2: ...ly All electrical power must be shut off during installationoftheChecker board APPLICATIONOFELECTRICALEQUIPMENT Do not initiate any circuits before all connectionshavebeenmade TORIT PRODUCTS is the le...

Страница 3: ...ration Airflow Bar Graph 22 23 4 2 Blower Rotation 23 4 3 Start Clean Stop Clean Adjustments 23 4 4 Service Interval 23 7 0 Troubleshooting Guide 24 27 Parts Ordering Information 3 28 Warranty 28 Figu...

Страница 4: ...on RemoteEnclosure Thermistor Twisted Pair CheckerBoard ControlVoltage andNeutral SolenoidWiring MotorPhase Leads ElectricalDisconnect Power 3Phase Regulator CoalescingFilterwith AutomaticDrain Shut O...

Страница 5: ...Reset Button Section 1 2 6 Section 1 2 4 Section 1 2 7 Section 1 2 5 Adjusts Set Point Upward Indicates Blower Operating Activates Set Point Adjustment Adjusts Set Point Downward Will Clean Filter Ca...

Страница 6: ...filter element cleaning function Control of the cleaning mode Continuous monitoring and diagnosis of the vital functions of the mechanical and electronic dust collector system components Monitoring of...

Страница 7: ...the host computer to change the settings start or stop the collector and retrieve all current readings With the use of host computer software addressing one computer could provide remote set point ad...

Страница 8: ...ion within the range 1 2 3 Set Point Indicator Figure 4 When using the set point adjustments window the bar display switches to a set point display with one or two lights illuminated When one light is...

Страница 9: ...the three adjustment buttons As an example if the START CLEAN button is pressed the light above the key will indicate successful initiation and the Set Point Indicator bar graph will switch from displ...

Страница 10: ...t located in the Maintenance Required window The system logic requires that the system be shut down before the reset button will function If the system is on the reset button will have no effect To re...

Страница 11: ...justment for Service Interval responds the unit is configured as an elapsed time indicator and is intended to signal proper service intervals for the dust collector The timer can easily signal any rou...

Страница 12: ...12 Donaldson Company Inc 1996 Figure 9 Pneumatic Installation Checkerboard Field Installed Bulkhead Fittings Furnished but Field Installed...

Страница 13: ...Donaldson Company Inc 1996 13 Figure 11 Current Sensor Wiring L1 L2 L3 Fan Motor CheckerBoard Figure 10 Thermistor Thermistor Field Wired by Others Remoted Wired...

Страница 14: ...tions Remote Checker Board The enclosure for the Checker board should be mounted in a location convenient for the operator or maintenance personnel Since the display provides visual warning of problem...

Страница 15: ...alandtheprintsreadily availableduringinstallation Allelectricalworkmustbedonebya qualifiedelectricianaccordingtolocal codes Microprocessor controlled devices with microcomputers and EPROMS require car...

Страница 16: ...Position A A B C JumperPositions Position A Position B Position C Figure 13 Jumper Position SDF 2 5 1 Blower Motor Current Sensor Setup Table See Figures 12 13 The motor amperage located on the motor...

Страница 17: ...ng Voltage hot See Figure 14 IN OUT HOT This is the primary voltage source for the board Acceptable voltages are 90 to 130 or 180 to 260 VAC 50 60Hz 1 The hot or phase wire connects to the IN terminal...

Страница 18: ...s controlled by the internal clock timer EXT IN 1 does not function 2 5 5 SER I O Serial Port Input Output See Figure 15 This RJ 11 socket provides the connection for the monitoring and control of mul...

Страница 19: ...olt AC or 24 Volt DC The 24 VDC version has a transformer to supply DC current to the relays The 24 VDC version leaves Relay 2 blank to provide separation of the 115 or 230 VAC motor starter voltage f...

Страница 20: ...er Board Relay 1 Relay Relay Relay Relay Relay Relay Relay Relay 3 4 5 6 7 8 9 10 24 VOLT POWER SUPPLY 1 2 3 4 5 6 7 8 9 10 Relay Relay Relay Relay Relay Relay Relay Relay Relay Relay SOL 1 SOL 2 SOL...

Страница 21: ...sure to the matching fittings on the SDF An installation drawing has been shipped with the Checker board which will show all of the proper connections 3 0 PRE START UP CHECKLIST Make sure all connecti...

Страница 22: ...utton until the indicator LED immediately above that button is lit see Figure 6 Again use the arrow buttons to locate and light the LED that seems appropriate for displaying the low flow condition Use...

Страница 23: ...should establish an initial setting for filter cleaning to match your system configuration Each light in the bar graph display is equal to approximately 0 75 wg see Figure 4 The system logic limits mo...

Страница 24: ...ontact factory service 5 Complete airflow configuration settings and exit to normal mode 1 Check for proper valve action and repair or replace as necessary 2 Check for proper valve action and repair o...

Страница 25: ...y checking the discharge airflow for visible plume Replace filters if visible discharge 2 Reset to correct damper settings 3 Check fuses circuit breakers and internal reset Repair or replace as necess...

Страница 26: ...h button and return to service 2 Perform service indicated by the external device and reset as above 1 Repair or replace as required 2 Adjust inlet or outlet damper s 3 Close open hopper discharge or...

Страница 27: ...If the pressure sensor is mounted on the top side of the printed circuit board the tube can be remounted with cyanoacrylate adhesive If mounted on the bottom side of the printed circuit board replace...

Страница 28: ...lting from said defects or nonconformity The foregoing does not apply to components which were not manufactured by the Seller and is expressly in lieu of all other warranties expressed or implied incl...

Отзывы: