3.2.2. Location.
Install the machine in a big room to obtain efficient work conditions and to guarantee the sufficient ease
of movement of the workers using the machine.
The definitive position of the machine must allow its correct use. The distances indicated on the
following drawing must be observed to allow correct maintenance by the authorised staff.
Minimum operation and maintenance space: 59 1/8 in (1.5 m) at the front, 12 in (305 mm) at the top,
and the rest according to the scheme.
The distances from combustible construction machine to be at least: to the ceiling 12 in (305 mm), side
0 in (0mm), front 59 1/8 in (1.5 m) and rear wall (steam exit) 24 in (610mm).
3.2.3. Levelling.
- Do not anchor the machine, simply put it on
a flat and levelled surface. Position the
four adjustable feet supplied and found
inside the machine. A good, levelled base
is important for correct operation.
Procedure:
- The machine must be supported on all four
legs so that it stands firmly on the ground
and does not rock.
- Adjust the 4 levelling feet to ensure the
stability and horizontality of the machine,
checking it with a spirit level. After
levelling, fasten the nut using a spanner.
- The maximum adjustment height at the
height of the levelling feet is 0.98in (25
mm).
13