background image

SURFACE MOUNTED

For installation on either wall or ceiling, follow the same procedures as frame mounted fans with the exception that the discharge 
duct needs to be flush with the surface of the inside wall or ceiling, to meet up with the discharge outlet of the surface mounting 
box.
Please refer to the following pages for relevant wiring diagrams. When fitting into surface mounting box it is necessary to remove 
the fan motor cover. To do this, remove the motor cover retaining screw. Ease front cover clear of the two clips. The motor cover 
may be discarded.
To fit the fan into the surface mounting box, first remove it’s front cover. This is retained by a screw on the bottom edge. Enter 
the electrical contact pins and discharge spigot into their sockets and push gently into position. Retain the fan with four 6mm 
screws supplied. Refit front cover.

WARNING: ISOLATE ELECTRICITY SUPPLY BEFORE COMMENCING WORK

WIRING REQUIREMENTS FOR DOMESTIC ELECTRIC FANS

It is recommended that fans be connected into the lighting circuit (see caution note on page 10)  with double pole (3mm) isolation, 
provided before the room light switch and suitably fused, in accordance with I.E.E. Regulations.

Wall and ceiling mounted fans for fixed wiring should be connected to the power supply via a cable with solid conductors of 1 to 
1.5mm

2

 only.

IF IN DOUBT CONSULT A QUALIFIED ELECTRICIAN

IMPORTANT

Surface mounting box (FLA 106A) and flat duct systems are manufactured from sheet metal and therefore require earthing.

NOTE

The Mayfair 2000 extractor fan and its mounting systems (with the exception of the above) are double insulated and do not require 
earthing. The mounting system is provided with an earth termination for convenience only.

Wiring Installation

S/L

N

S/L

N

OPERATING SWITCH

ISOLATOR SWITCH

FRAME TERMINALS

S/L = SWITCH LIVE

N = NEUTRAL

L

N

L

N

ISOLATOR SWITCH

FRAME TERMINALS

L = LIVE

N = NEUTRAL

Models

MSS 070B

Models

MPC 070B

MIR 070B

A guide to
Ventilation

WHERE TO SITE YOUR FAN

Incorrect siting of an extractor fan can se-
verely impair its efficiency. It is therefore 
important that the fan is correctly sited 
using the following principles:

•  To ensure maximum air flow through 

the whole room, mount in the wall or 
ceiling furthest from the air inlet point 
and at high level.

•  Do not position a fan where tempera-

tures are likely to exceed 40ºC.

•  When installing in a room with an 

open fire or stove without a balanced 
flue, ensure that there is sufficient 
replacement air to prevent the fan 
drawing air back down the flue.

•  A 230 Volt fan installed in a bathroom 

must not be within reach of a person 
using the bath or shower.

•  Always use an in-Duct or Low Voltage 

Fan (SELV) to ventilate a shower cubi-
cle

WARNING:

Positioning the fan unit must be so as to 
avoid the back flow of gases from open 
flue or other open fire appliances.

Also to prevent combustion gases enter-
ing the air inlet, the air inlet must not be 
positioned above or within 1

1

/

2

 metres of 

a combustion flue vent.

Building Regulation Requirements

Room 

Extract Rate

Bathroom/shower room 

54m

3

h (15 l/s)

with or without toilet

Toilet 

21.6m

3

h (6 l/s)

Non domestic sanitary 

21.6m

3

h (6 l/s)

accommodation (and/or 

per w/c or 3 air

washing facilities) 

changes per hour.

Rooms without opening windows require fans 
to be fitted with 15 minute overrun timers.

NOT FOR USE IN SHOWER CUBICLES OR ABOVE BATHS FITTED WITH A SHOWER.

MAX ROOM TEMPERATURES 40ºC

A guide to Ventilation

Содержание MTD 070B

Страница 1: ...by breathing through the sensor grille on the front cover Note There is a short delay between breathing through the grille and the fan starting Do not use steam from a kettle to test the unit CLEANING MAINTENANCE From time to time the fan unit will need cleaning To do this first isolate power supply Remove front cover as described above Remove the fan from its mounting by undoing the four corner s...

Страница 2: ...and will give many years of reliable service APPLICATION BATHROOMS TOILETS UTILITY ROOMS LOBBIES AND HALLWAYS The Mayfair 2000 complies with all current Building Regulations Description Model 70 70m3 h 20 l s 43m3 h Extract Volume High Speed Extract Volume Low Speed Options Single Speed Single Speed Pull Cord Single Speed Time Delay Twin Speed Twin Speed Time Delay Single Speed Condensation Contro...

Страница 3: ...ated and do not require earthing The mounting system is provided with an earth termination for convenience only Wiring Installation S L N S L N OPERATING SWITCH ISOLATOR SWITCH FRAME TERMINALS S L SWITCH LIVE N NEUTRAL L N L N ISOLATOR SWITCH FRAME TERMINALS L LIVE N NEUTRAL Models MSS 070B Models MPC 070B MIR 070B A guide to Ventilation WHERE TO SITE YOUR FAN Incorrect siting of an extractor fan ...

Страница 4: ...l as possible cut a hole through the wall to take a 100mm duct for the fan discharge This should slope downwards towards the outside to allow for condensation drainage When this is done position the building in frame with the discharge outlet at the top right over the duct hole Mark around the frame and cut an aperture to take the frame and fan It is important that the front edge of the frame is f...

Отзывы: