EN
Rollerblind PrecisionRise
Operation
7
➤
Proceed as shown:
–
MP
leaflet: fig.
to fig.
–
CA
leaflet: fig.
➤
Proceed as shown to remove the blinds:
–
MP
leaflet: fig.
–
CA
leaflet: fig.
6.2
Fitting the guide wire versions
➤
Proceed as shown:
–
MP
leaflet: fig.
to fig.
–
CA
leaflet: fig.
➤
Fix the hold down according to the chosen option:
–
Dome mounted hold down (
A
) (
MP
leaflet: fig.
CA
leaflet:
to fig.
)
–
Flush mounted hold down (
B
) (
MP
leaflet: fig.
CA
leaflet:
to fig.
)
–
Low profile hold down (
B
) (
MP
leaflet: fig.
CA
leaflet: fig.
)
–
Extended guide wire hold down (
C
) (
MP
leaflet: fig.
,
CA
leaflet:
to fig.
)
7
Operation
7.1
Deploying the blind
➤
Pull the blind by the hem bar to the desired position.
7.2
Stowing the blind
➤
Pull the hem bar down and release it.
Содержание Rollerblind PrecisionRise
Страница 92: ...RU Rollerblind PrecisionRise 92 A I 2 8 3 3...
Страница 93: ...RU Rollerblind PrecisionRise 93 10 A 3 MP CA 4 1 1 1 2 3 2 C3 4 2 GW...
Страница 96: ...RU Rollerblind PrecisionRise 96 7 7 1 7 2 7 3 5 1 2 3 5 5...
Страница 97: ...RU Rollerblind PrecisionRise 97 8 A I...
Страница 98: ...RU Rollerblind PrecisionRise 98 9 10 dometic com dealer 95 dometic com dometic com...
Страница 99: ...RU Rollerblind PrecisionRise 99 11...