8.3 Switching between battery banks
In some applications, two battery banks with different nominal voltages need to be charged from the same solar
array. An external switch or relay can be used to select which battery bank is charged by the solar charge controller.
The controller automatically determines nominal system voltage at startup. If there is a large jump in battery voltage
(i.e. switching from one battery bank to another with a different nominal voltage), then the controller will detect the
new nominal system voltage and reset.
A
9 Cleaning and maintenance
!
A
➤
Occasionally clean the device with a soft, damp cloth.
➤
Regularly check live cables or lines for insulation faults, breaks or loose connections.
The device is maintenance-free.
On (green)
Normal operation.
Flashing slowly (green)
Full.
Flashing fast (green)
Overvoltage.
On (orange)
Undervoltage.
On (red)
Over discharged.
Flashing fast (red)
Battery overheating or low temperature.
Charging (green) and Battery status LED
(orange) flashing simultaneously
System voltage error.
NOTICE!
When using LiFePO4 batteries, the controller does not recognize system voltage auto-
matically. The custom parameters must be entered by the user. When wrong or no
parameters entered, the controller LEDs will indicate a “System voltage error”.
NOTICE! Damage hazard
Switching between battery banks must be done with an external device. Each battery
bank must have a fuse or breaker. The switching circuit must not allow the battery
banks to be connected or shorted.
WARNING!
Unplug the device from the power supply before cleaning and maintenance
NOTICE! Damage hazard
• Never clean the device under running water or in dish water.
• Do not use sharp or hard objects, abrasive cleaning agents or bleach during clean-
ing as these can damage the device.
LED
Status
Indication
GoPowerDometicGP-MPPT-60-10_IOM_4445103825_EMEA16_2022-xx-xx.book Page 10 Friday, October 14, 2022 5:04 PM
Содержание GP-MPPT-60/10
Страница 153: ...GoPowerDometicGP MPPT 60 10_IOM_4445103825_EMEA16_2022 xx xx book Page 153 Friday October 14 2022 5 04 PM ...
Страница 154: ...GoPowerDometicGP MPPT 60 10_IOM_4445103825_EMEA16_2022 xx xx book Page 154 Friday October 14 2022 5 04 PM ...
Страница 155: ...GoPowerDometicGP MPPT 60 10_IOM_4445103825_EMEA16_2022 xx xx book Page 155 Friday October 14 2022 5 04 PM ...