Installation Clearances
DuraSea Condenser Installation, Start-Up & Service Manual
6
L-3153
AVOID:
•
Locations that permit water from higher level runoff and overhangs to fall onto the unit.
•
Direct tubing contact with water pipes, ductwork, floor joists, floors, and walls.
•
Suspending refrigerant tubing from structure with rigid wire or straps that would come in contact with tubing.
DO locate the unit:
•
To minimize the length of refrigerant piping required.
•
To provide adequate service clearances.
•
On a level surface or other sturdy platform.
•
Isolated from the structure to avoid transmission of vibrations.
DO:
•
Leave slack between structure and unit to absorb vibration.
•
When passing refrigerant tubes through the bulkhead, seal the opening with RTV or a pliable silicon-based caulk.
•
Ensure that the suction and liquid line tube diameters are appropriate for unit capacity.
•
Avoid unnecessary turns and bends by running refrigerant tubing as directly as possible.
•
In general, short runs of refrigerant piping are better than long runs. If practical, locate the unit accordingly.
Figure 3: Installation Clearance - DCA 24-72
Figure 4: Installation Clearance - DCA 90-120
METRIC
CONVERSION CHART
inches (")
cm
6
15
12
30
18
45
24
60
Содержание DuraSea DCA120D
Страница 27: ...NOTES ...