Dometic 459146.70X Скачать руководство пользователя страница 6

6

B.  Roof Preparation

1. 

 

FIRE OR ELECTRICAL SHOCK 

HAZARD. Verify there are no obstacles inside 

RV’s roof and/or walls (wires, pipes, etc.). Shut 

 

OFF 

gas supply, disconnect 120 Vac power from 

RV and disconnect positive (+) 12 Vdc terminal 

from supply battery 

BEFORE 

drilling or cutting 

into RV. Failure to obey these warnings could 

result in death or serious injury.

Opening Requirements - Before prepar-

ing the ceiling opening, read all of the fol-

lowing instructions before beginning the 

installation.

If an existing roof vent opening will

 NOT 

be used a roof opening

 MUST 

be cut 

through the roof and ceiling of the RV. 

This opening

 MUST 

be located between 

the roof reinforcing members. 

2.  Roof vent removal

a.  Unscrew and remove the roof vent.
b.  Remove all caulking compound around 

opening.

c.  Seal all screw holes and seams where the 

roof gasket will be located. Use a good grade 

of all weather sealant.

d. 

If the opening exceeds 14-3/8″ x 14-3/8″, it 

will be necessary to resize the opening. See 

"B. Roof Requirements" on page (4).

e. 

If the opening is less than 14-1/8″ x 14-1/8″, 

it must be enlarged. See "B. Roof Require-

ments" on page (4).

3.  New opening

a.  Carefully mark and cut the required roof 

opening. See "B. Roof Requirements" on 

page (4).

b. 

 

Maintain structural integrity. 

Otherwise damage to product and/or RV 

could occur.

 

NEVER 

create a low spot on 

RV roof. Otherwise, water will pool and could 

cause a leak.
Using the roof opening as a guide, cut the 

matching hole in the ceiling.

The opening created must be framed to pro-

vide adequate support and prevent air from 

being drawn from the roof cavity. Framing 

stock 3/4″ or more in thickness must be used. 

Remember to provide an entrance hole for 

power supplies at the front of the opening. 

See (FIG. 4).

3/4″ Min.

Leave Access For 

Power Supply Wiring

FIG. 4

15″ Min. At

Front Of

Opening

Do Not Cut Roof

Structure Or

Rafters

Good-Rafters

Supported By 

Cross Beams

Good Location

Between Roof 

Rafters

Frame Opening So It 

Won't Collapse When 

Bolting Down Unit

C.  Wiring Requirements

1.  Route a copper, with ground, 120 Vac supply 

wire from the time delay fuse or circuit breaker 

box  to  the  roof  opening.  Use  a  listed/certified 

non metallic - sheathed single strand cable. The 

proper size wire can be determined from chart 

on page 4.

If vent fan was removed, the existing wire 

may be used provided it is of proper type, 

size, location, and correctly fused. 

a.  This supply wire must be located in the front 

portion of the roof opening.

b.  The power 

MUST

 be on an appropriately 

sized separate time delay fuse or circuit 

breaker. The proper size protection can be 

determined from chart on page 4.

c. 

Make  sure  that  at  least  15″  of  supply  wire 

extends into the roof opening. This insures 

an easy connection at the junction box.

d.  Protect the wire where it passes into the 

opening with approved method.

D.  Placing Unit On Roof

1.  Remove the unit from the carton and discard 

carton.

2. 

 

LIFTING HAZARD. Use proper 

lifting technique and control when lifting product. 

Failure to obey this caution could result in injury.
Place unit on the roof.

INSTALLATION INSTRUCTIONS

Содержание 459146.70X

Страница 1: ...structions MUST stay with this product Model 459146 70X 459146 71X B59146 71X REVISION A Form No 3315386 000 5 13 French 3315387 000_A 2013 Dometic Corporation LaGrange IN 46761 RECORD THIS INFORMATION FOR FUTURE REFERENCE Model Number Serial Number ADB Model Number ADB Serial Number Date Purchased Roof Top Unit Description Model Use With Air Distribution Box Model Control Heat Pump 459146 B59146 ...

Страница 2: ...e 12 MAINTENANCE 13 A Air Filter 13 B ADB Housing 13 C Fan Motor 13 GENERAL INFORMATION 13 A Frost Formation 13 B Heat Gain 13 C Condensation 13 SERVICE UNIT DOES NOT OPERATE 14 WIRING DIAGRAMS 14 A Unit Wiring Diagram 14 B ADB Wiring Diagram 14 INTRODUCTION This air conditioner hereinafter referred to as unit or product is designed and intended for installation on the roof of a Recreational Vehic...

Страница 3: ... all safety information and instructions to avoid possible injury or death Read and understand these instructions be fore installing using servicing performing maintenance on this product Incorrect installation operation servicing maintaining of this product can lead to seri ous injury Follow all instructions The installation MUST comply with all ap plicable local or national codes including the l...

Страница 4: ...er sizing Dometic Corporation gives GENERAL guidelines for generator requirements These guidelines come from experiences people have had in actual applications When sizing the generator the total power usage of your RV must be considered Keep in mind generators lose power at high altitudes and from lack of maintenance CIRCUIT PROTECTION Time Delay Fuse or Circuit Breaker Required B Roof Requiremen...

Страница 5: ...stalled on a relatively flat and level roof section measured with the RV parked on a level surface See table below for maximum acceptable tilt Model Number Max Tilt 459146 B59146 15 After Location Has Been Selected c Check for obstructions in the area where unit will be installed See FIG 1 FIG 2 29 7 8 34 7 8 13 1 8 18 Front Dimensions Are Nominal FIG 1 Keep This Area Free Of Obstructions Roof Ope...

Страница 6: ...atching hole in the ceiling The opening created must be framed to pro vide adequate support and prevent air from being drawn from the roof cavity Framing stock 3 4 or more in thickness must be used Remember to provide an entrance hole for power supplies at the front of the opening See FIG 4 3 4 Min Leave Access For Power Supply Wiring FIG 4 15 Min At Front Of Opening Do Not Cut Roof Structure Or R...

Страница 7: ...2 5 3 0 7 4 5 5 0 3 2 0 2 5 8 4 0 4 5 4 1 5 2 0 9 3 Do NOT slide unit Otherwise damage to gasket on bottom of unit may occur and could cause a leak Lift and place the unit over the prepared open ing using the gasket on the unit as a guide See FIG 5 FIG 5 Do Not Slide Lift And Place Front 4 Place the ADB kit inside the RV This box con tains mounting hardware for the unit and will be used inside the...

Страница 8: ...ector b Install supplied non metallic cable connector in junction box hole cutout See FIG 11 for proper orientation c Route the previously run 120 Vac power sup ply wire through cable connector and into junction box d Secure 120 Vac power supply by tightening cable connector clamp making sure not to damage wires See FIG 11 e Hold the ceiling template up to the roof open ing and line up the channel...

Страница 9: ... in compliance with all applicable electrical codes Failure to obey this warning could result in death or se rious injury c Connect white to white black to black using appropriate size connectors Secure bare copper wire under grounding screw in junc tion box See FIG 15 FIG 15 Junction Box Cover Junction Box Cover Screw d Tape the connectors to the supply wire to as sure they don t vibrate loose e ...

Страница 10: ...rille into the ADB Slide re turn air vent grille tab into slot in ADB and rotate up and snap in place See FIG 20 INSTALLATION INSTRUCTIONS FIG 17 Hole In Ceiling Template ADB Hole Alignment Hole In ADB Cover 2 Install two 2 supplied sheet metal screws in side return air opening to secure ADB to ceiling template See FIG 18 3 Install eight 8 supplied wood screws inside the front rear and side doors ...

Страница 11: ...1 FIG 21 Knob 8 The unit installation is now complete and is ready for operation The power supply to the unit may now be turned on 9 Verify that all features of the installed system work Please read the following operating in structions before attempting to run the unit INSTALLATION INSTRUCTIONS ...

Страница 12: ...rature set lever Other wise compressor will quick cycle and could result in compressor or supply circuit over load OPERATING INSTRUCTIONS D Heating Operation Red Graphic The heat pump mode of operation will NOT replace a furnace for heating your RV in cold weather The intent is to remove the chill on cool days or mornings 1 Set the thermostat to the desired temperature level 2 Turn the selector sw...

Страница 13: ...ng 1 Clean ADB housing and control panel with a soft cloth dampened with a mild detergent Never use furniture polish or scouring powders C Fan Motor 1 The blower motor is factory lubricated and re quires no service B Heat Gain The ability of this air conditioner to maintain the desired inside temperature depends on the heat gain of the RV Some preventative measures taken by the occupants of the RV...

Страница 14: ...urnt or circuit breaker is ON and not activated After the above checks call your local service center for further help This unit must be ser viced by qualified service personnel only When calling for service always give the following Unit model and serial number found on the identification label located on base pan of unit bottom Return air vent grille must be removed from ADB to view ADB model an...

Отзывы: