background image

8

I.  Wiring The System

 

1.  120 VAC Power Supply Connection

 

a.  Route the 120 VAC supply wire through the 

strain relief in the SZLCD control box. Tighten 

strain relief, making sure enough wire is in-

side SZLCD control box to connect with unit 

120 VAC wires.

 

b.  Connect  the  white  to  white;  black  to  black; 

and green or bare copper wire using appro-

priate  size  wire  connectors.  See  chart  on 

page 3.

 

c.  Push  the  wires  into  the  SZLCD  control  box 

and install the cover with the four blunt point 

screws provided.

 

2.  Low  Voltage  Wire  Connections  At  The  SZLCD 

Control Box.

Note:

 If a solar panel is to be installed see instructions 

packaged with solar panel option.

Note:

  Plastic  SZLCD  control  boxes  only.  Plug  the  sup-

plied 4 wire harness and the supplied 2 blue wires into 

their matching connectors in the SZLCD control box.

 

a.  Connect the previously run +12 VDC supply 

wire to the red wire from the SZLCD control 

box.

 

b.  Connect the previously run –12 VDC supply 

wire to both the black wire from the SZLCD 

control box and to wire of the three wire cable 

that goes to the thermostat 12V– terminal.

 

c.  Connect the previously run furnace thermo-

stat  wires  (if  applicable)  to  the  blue  wires 

coming from the SZLCD control box.

Disconnect 120 VAC. Failure to obey these 

instructions  could  create  a  shock  hazard 

causing death or severe personal injury.

This product is equipped with a 3 wire (ground-

ed) system for protection against shock haz-

ard. Make sure that the unit is wired and that 

you connect into a properly grounded 120 VAC 

circuit and the polarity is correct. Failure to 

do so could result in death, personal injury 

or damage to the equipment.

Disconnect the positive (+) 12 VDC terminal 

at the supply battery. Damage to equipment 

could occur if the 12 VDC is not shut off.

J.  Installing The Unit

 

1.  Install the SZLCD control box on the ceiling tem-

plate as shown in FIG. 11. Drive two (2) #6 x 3/8" 

(plastic control box) or #10 x 3/8" (metal control 

box) blunt point Phillips head screws (provided) 

through  the  ceiling  template  into  holes  in  the 

SZLCD control box to hold into place.

 

2.  If  your  installation  includes  the  optional  electric 

heat kit,

 

(457915 & 459516 models only) install it 

at this time. Follow the instructions with the heat 

package for its installation procedure.

 

3.  Install ceiling template by sliding the lower duct 

over upper duct.

 

4.  Hold  the  ceiling  template  up  to  the  14-1/4"  x 

14-1/4" (±1/8") opening with one hand and with 

the other, install the four (4) 1/4" mounting bolts 

through the template and into the unit base pan.

 

a.  Tighten all four (4) mounting bolts until they 

touch  the  template  but  are  not  tight.  Check 

alignment. There should be an equal open-

ing on each side and the rear flange must be 

tight against the roof opening.

 

b.  With the ceiling template flat against the ceil-

ing install six (6) wood screws (installer sup-

plied) at an angle, so as to stretch and flat-

ten the template. Three across the front and 

three  across  the  back  of  the  template.  See 

FIG. 13.

SZLCD

Control Box

Ceiling Template

FIG. 11

FIG. 12

Mounting Bolts

Discharge 

Air Duct

Duct Screws

Mounting Bolts

 

d.  Connect the red/white wire from the SZLCD 

control box to wire of the three wire cable that 

goes to thermostat 12V+ terminal.

 

e.  Connect  the  orange  wire  from  the  SZLCD 

control box to wire of the three wire cable that 

goes to thermostat COMMS terminal.

Содержание 457915.30X

Страница 1: ...mber ADB Serial Number Date Purchased INSTALLATION INSTRUCTIONS This unit is designed for OEM installation Roof Top Unit Description Model Use With Air Distribution Box Model 3107210 XXX SZLCD Control...

Страница 2: ...ioner to maintain the de sired inside temperature depends on the heat gain of the RV Some preventative measures taken by the occupants of the RV can reduce the heat gain and improve the performance of...

Страница 3: ...196 70X 15 000 13 3 66 0 2 0 5 6 29 0 20 Amp 3 5 KW 5 0 KW 459516 30X 15 000 13 4 64 0 2 0 5 6 27 5 20 Amp 3 5 KW 5 0 KW 459516 70X 15 000 13 3 66 0 2 0 5 6 27 5 20 Amp 3 5 KW 5 0 KW 459530 70X N A 8...

Страница 4: ...equired 1 Foroneunitinstallation Theunitshouldbemounted slightly forward of center front to back and cen tered from side to side 2 For two unit installations Install one unit 1 3 and one unit 2 3 s fr...

Страница 5: ...wall 3 NEVER expose the thermostat to direct heat from lamps sun or other heat producing items 4 Avoid locations close to doors that lead outside windows or adjoining outside walls 5 Avoid locations...

Страница 6: ...touching any other terminals or wires g Push the wires back through the base into the wall Place cover on the thermostat and push until an audible click is heard G Placing The Unit On The Roof 1 Remov...

Страница 7: ...someapplicationsitmaybenecessarytoextendthe 6 pin cable Order cable number 3105584 001 if needed 7 Measure the ceiling to roof thickness a If distance is 2 3 remove perforated tabs from lower duct See...

Страница 8: ...could result in death personal injury or damage to the equipment Disconnect the positive 12 VDC terminal at the supply battery Damage to equipment could occur if the 12 VDC is not shut off J Installi...

Страница 9: ...unting point See FIG 15 Wood Screws FIG 13 Return Air Grill FIG 14 Half Round Catches Fig 15 Screws Wood Screw Wood Screw Plug Fig 16 3 Snap hole plug into place at rear of air distribution box See FI...

Страница 10: ...67 7 6833 9 851 851 9 5 7 5 25 200 9 8 8 9 72 767 7 1 7 1 87 51 57 21 21 8 7256 2 86 233 5 9 5 6 1625 5 5 8 20 12 520 211 7 51 5 8 7 6 352 8 7 6 6833 5 1 6 67 0 7 7 1 25 1 7 1 1 75 2 3 57 1 7 1 7 21 7...

Страница 11: ...21 21 8 7256 2 86 233 5 9 5 5 5 6 1625 6 1625 287 225 7 03 5 5 8 20 12 520 211 7 51 5 8 7 6 352 8 7 6 6833 5 1 6 67 0 7 7 1 25 1 7 1 1 75 2 3 57 1 7 1 7 21 75 2 16 1 3 12 5 48 5 6 7 167 7 21 2 1 48 3...

Отзывы: